Planning injunction sentencing in the High Court has resulted in suspended prison terms for eight defendants after serious breaches at a Bedfordshire Traveller site. Mr Nicholas Bacon KC, sitting as a Deputy High Court Judge, handed down Central Bedfordshire Council v Bernard McDonaugh & Ors [2026] EWHC 2860 (KB) on 5 November 2026.
The court had already found numerous breaches of an injunction affecting land behind Home Farm at Tilsworth, near Leighton Buzzard. Those breaches included continued residential occupation, additional caravans, hardstanding, fencing and other structures. The sentencing decision addresses the consequences for individual defendants rather than deciding whether the site should receive planning permission.
The unusual feature was that Central Bedfordshire Council was then likely to grant retrospective permission for up to nine pitches, subject to an acceptable unilateral undertaking. The judge treated that prospect as important mitigation, but not as an answer to deliberate disobedience of an existing court order.
Planning injunction sentencing: what the court decided
The full sentencing decision is held in Planning Geek’s Case Law entry for [2026] EWHC 2860 (KB). The separate liability judgment, [2026] EWHC 2675 (KB), explains which allegations were proved and which were not.
The two defendants treated as most culpable received six-month prison sentences. The court found their conduct serious, deliberate, consequential and continuing. They knew the injunction prohibited further development, yet the breaches had not been remedied.
Three further defendants received four-month terms. Another three received three-month terms. All eight sentences were suspended for two years, until 4 November 2028.
Two defendants with more limited involvement did not cross the custody threshold. The court imposed no separate sentence on them beyond their liability for costs. Two other defendants had admitted remaining on the land in breach of the order; their admissions and limited roles led to no sentence being imposed.
The different outcomes are important. Planning injunction sentencing is individual. The court considered the conduct proved against each person, the duration of the breach, knowledge, admissions, personal mitigation and the likely impact on others.
Why likely retrospective permission mattered
By the hearing, council officers had resolved to grant retrospective permission for up to nine pitches. The grant remained subject to a unilateral undertaking providing mitigation for the Chilterns Beechwoods Special Area of Conservation.
The judgment records a proposed contribution of about £45,000. An updated undertaking had been provided, and the court was told that the council was likely to treat it as satisfactory. A final council decision was expected at a meeting on 19 November 2026.
That was not the same as an issued planning permission on the judgment date. For planning injunction sentencing, the court proceeded on the basis that permission was realistically likely. Given those planning developments, the judge agreed with the council that the harm was properly categorised as medium to low.
The judge nevertheless said: Planning consents and necessary development consents must be obtained in advance of development.
A future permission could not retrospectively remove the fact that development had taken place in breach of a High Court order.
Planning Geek’s guide to Gypsy and Traveller site planning explains the separate policy and application questions, including site need, supply and the planning balance. Those matters can change the prospects of permission without changing the binding effect of an injunction already made.
The conditions attached to suspension
The suspended sentences were not unconditional. The eight defendants must not undertake, encourage, instruct or allow further development on the land without planning permission or the written consent of the council’s solicitor.
For this purpose, development takes its meaning from section 55 of the Town and Country Planning Act 1990. The defendants must also comply with any later planning permission granted for residential use.
The judgment states the practical position clearly: no more caravans, mobile homes, structures or buildings may be brought onto the land unless and until a fresh permission allows it. A breach of the sentencing order could bring the defendants back before the court and lead to all or part of the custodial term being activated.
The court also recorded the right to appeal to the Court of Appeal, without permission, within the applicable 21-day period.
Costs added a further consequence
Central Bedfordshire Council said the committal proceedings had cost about £87,000. The judge declined to carry out a summary assessment because the case was involved and the hearing had lasted more than one day.
Ten defendants were ordered to pay the council’s costs jointly and severally, subject to detailed assessment if the amount is not agreed. A payment of £45,000 on account must be made by 4 May 2027.
In this planning injunction sentencing decision, the costs order sits alongside the suspended sentences. Even where immediate imprisonment is avoided, contempt proceedings can leave defendants exposed to substantial costs and continuing compliance conditions.
Applications and injunctions remain separate
The planning injunction sentencing decision is a useful reminder that a planning application does not pause or vary a court order. Nor does an enforcement appeal automatically change an injunction. A party seeking different terms must use the proper court procedure for variation or discharge.
Planning Geek’s planning injunction guide explains why authorities use this route for serious actual or threatened breaches of planning control. The related guide to planning enforcement powers places injunctions alongside notices, stop notices, direct action and prosecution.
For practitioners, the timing point is critical. If policy changes or new mitigation make permission more likely, that evidence should be placed before the council and, where necessary, the court. It should not be treated as permission to ignore the existing order.
The judgment also shows that regularisation can affect planning injunction sentencing. The realistic prospect of permission informed the medium to low harm category and was reflected in the form of the order the judge made. But the court continued to treat deliberate non-compliance as serious enough to cross the custody threshold for eight defendants.
What happens next
The immediate planning question is whether the council grants the anticipated retrospective permission and on what conditions. The judgment records an expected decision on 19 November 2026, but the outcome must be checked rather than assumed.
If permission is granted, the defendants covered by the suspended sentences must comply with it. Any further development outside its scope would also have to satisfy the sentencing order’s conditions.
The liability and sentencing judgments now provide a detailed record of the enforcement history, the evidence considered and the court’s response. Together they underline a simple but consequential point: later planning regularisation may reduce harm, but it does not erase contempt of court.