James v Brecon: fairground swing boats

James v Brecon County Council (1963) 15 P & CR 20 is an early Divisional Court decision concerning the meaning of a building under planning control.

Movable fairground swing boats did not amount to buildings in the circumstances considered by the court, despite their height and temporary anchoring on the land.

The decision is useful when comparing portable equipment with larger and more permanent installations that may constitute operational development.

Important legal note: Planning Geek is a planning consultancy, not a law firm. This page provides general planning information and is not legal advice. Case law must be read in its factual and legal context and may be affected by later judgments, legislation or policy. Where the original judgment is available, it remains the authoritative source. If the outcome matters to a live case or dispute, take advice from an appropriately qualified planning solicitor or barrister.

Copyright and licensing: Crown copyright and other rights in judgments and source material remain with the relevant rights holders. Where a judgment is reproduced from Find Case Law, it is used under the Open Justice Licence and the source should be acknowledged. Material obtained from other sources is reproduced only where the applicable terms permit it. Planning Geek does not claim copyright in the text of court judgments.

Fairground equipment and the enforcement dispute

Two units of fairground swing boats were erected, with each unit comprising three boats and reaching approximately 12 to 15 feet in height.

The units were anchored with stakes, but each could be lifted and carried by four people.

Magistrates had found the owner to be in breach of an enforcement notice.

The Divisional Court took a different view of the planning question, concluding that the equipment was not capable of being classified as a building on the facts presented.

Why the decision matters

The statutory planning definition of a building encompasses a structure or erection, but does not turn every object or item of movable equipment into a building.

Portability, construction, scale and the physical relationship with the land can all inform whether development has occurred.

James offers a useful contrast with Skerritts of Nottingham (No 2), where the substantial size, lengthy erection process and seasonal presence of a marquee supported the finding that it was a building.

The Cardiff Rating Authority line of reasoning identifies size, permanence and physical attachment as material rather than mechanically decisive factors.

James should not be read as giving automatic planning immunity to fairground structures or portable equipment, because the question turns on the facts and the particular development alleged.

The distinction between introducing a building and making a material change of use may also be important to the correct route of enforcement.

Subsequent treatment and source status

The High Court discussed James in Tewksbury Borough Council v Keeley [2004] EWHC 2594 (QB), alongside Barvis and the Court of Appeal judgment in Skerritts.