Aldi Leicester appeal fails over trees and roads

Aldi's Leicester supermarket appeal fails over protected trees, cycle safety and biodiversity despite significant regeneration benefits.

by | 17th November 2026 18:29 | AppealsEcologyPlanning Policy

An Aldi Leicester appeal has been dismissed after an Inspector found that a proposed supermarket, drive-through coffee shop and care home would harm protected trees, highway safety and biodiversity net gain arrangements. The decision, issued on 17 November 2026, concerns the former Premier Inn site at the junction of Narborough Road and Braunstone Lane East.

Aldi Stores Limited had challenged Leicester City Council’s refusal of a hybrid application, with detailed permission sought for a foodstore and outline permission for the other two uses. Inspector Edward Dade acknowledged substantial potential benefits from redeveloping the prominent vacant site, but decided that those benefits were substantially outweighed by the identified harm.

The Aldi Leicester appeal also illustrates the limits of revising plans during an appeal and the difference between purchasing biodiversity units and reserving them. Both Aldi and the council applied for their costs, but neither party secured an award. The decision relates to the original application, not a separately reported revised scheme.

Why the Aldi Leicester appeal failed

The application, reference 20251611, proposed demolition of the former hotel and other buildings, a new Class E supermarket, access and parking works, plus outline elements for a Class E drive-through coffee shop and accommodation for older people. The description included felling ten trees protected by Tree Preservation Order 25001. The appeal was dealt with by written representations following an Inspector’s visit on 29 October 2026.

Leicester adopted its 2026 Local Plan after the original refusal, and the Government published a revised National Planning Policy Framework in August 2026. Inspector Dade considered both policy changes after the parties had been given the opportunity to respond. He identified three main issues: protected trees and local character, highway safety, and whether the statutory biodiversity gain condition could be discharged.

The Aldi Leicester appeal was not simply a dispute over the loss of a hotel or whether the neighbourhood needed a new shop. The former hotel plot was already largely vacant and partly demolished, making redevelopment attractive in principle. Nevertheless, the Inspector’s task was to decide whether this particular layout and its supporting evidence met the development plan and national policy requirements.

Protected trees and the cycle route

Groups of mature trees along Braunstone Lane East and Narborough Road had been planted as part of the hotel’s landscaping around 55 years earlier. The Inspector described their contribution to the street scene, screening busy roads and softening the impact of signals, poles and other highway infrastructure. He did not accept that new planting would quickly replace the mature tree canopy.

Two arboricultural reports, from July 2025 and October 2026, disagreed about the quality and number of trees affected. The Inspector considered both, but the newer assessment arrived at the final-comments stage when consultees had not had a proper opportunity to respond. The original plans and the application’s express proposal to remove ten protected trees remained important to the assessment.

The Aldi Leicester appeal failed in part because all four protected tree groups would lose trees, with particular harm along Braunstone Lane East. The Inspector considered that replacement landscaping could not wholly compensate for the loss of the well-established screening. Planning Geek’s guide to trees and planning permission explains how Tree Preservation Orders affect development proposals and tree removal.

Highway objections were equally consequential. The existing roads already carried significant traffic. The original plan would remove a section of the dedicated cycle lane on Braunstone Lane East near the proposed main access, leaving cyclists to ride with general traffic for about 93 metres. The Inspector was concerned that this would require cyclists to rejoin general traffic where movements into and out of the new store would intensify.

The submitted swept-path drawings also did not satisfactorily demonstrate how heavy goods vehicles would turn without conflict with other vehicles or pedestrians. The Narborough Road access raised additional concerns about large vehicle movements and drivers seeking to turn across multiple lanes. Proposed parking spaces were also shorter than the council’s relevant design standard, without consistent evidence to justify the departure.

Inspector Dade concluded that the scheme would have an unacceptable adverse impact on highway safety. The point was not that any supermarket at the junction must be refused. Rather, the actual access drawings, vehicle movements and cycle facilities had to work together. Later alternative drawings were not sufficiently consistent with the original masterplan to resolve the objection.

Why the biodiversity units were not enough

The biodiversity net gain issue was not limited to whether Aldi had commissioned ecological reports. Both parties accepted there would be a residual biodiversity deficit. Aldi proposed to address it by buying off-site units from a registered habitat bank, and it produced quotations from providers indicating that units were available.

The Inspector distinguished a quotation from an enforceable commitment. The providers’ terms indicated that the units would not be held for the development until reservation or payment. That left a risk of the units being sold elsewhere before the statutory biodiversity gain plan was determined, and the Inspector could not be satisfied that the condition was capable of being successfully discharged.

The Aldi Leicester appeal therefore demonstrates a useful evidential distinction. Biodiversity net gain is normally secured through a deemed condition after planning permission, and an application should not ordinarily be refused merely because a final gain plan is outstanding. But where the evidence leaves genuine uncertainty about whether the condition can be met, the planning decision may still be affected. Planning Geek’s biodiversity net gain guidance explains the statutory framework and off-site options.

Revised plans refused and costs applications dismissed

Aldi proposed substantial amendments while the appeal was under way, including a smaller and relocated foodstore, altered positions for the drive-through and care home, different parking, revised road accesses and further tree retention. Inspector Dade declined to accept the revisions because they changed the overall arrangement and scale in ways that would risk procedural unfairness to consultees and interested parties.

The Aldi Leicester appeal did not give the applicant a second planning application through the appeal procedure. Although some changes may be accepted in exceptional cases, a materially changed hybrid scheme should normally be assessed through an appropriately consulted application. Planning Geek’s guide to planning application reconsultation explains why the scale of revisions and participation rights matter.

Aldi sought its costs against the council, citing alleged failures in pre-application engagement and circulation of consultation responses. The Inspector refused that application, noting the council’s pre-application report, discussions and offer of a design workshop. He considered the council had decided the application within the relevant period and had not acted unreasonably in declining to defer a fundamentally problematic scheme.

The council also sought its costs against Aldi, relying on revised drawings and alleged inaccuracies in ecological and tree material. That application was refused too. The Inspector found that making submissions through qualified consultants and pursuing an appeal with arguable merits did not, on the evidence, demonstrate unreasonable conduct that caused unnecessary expense. Planning Geek’s planning appeal costs guide explains why losing an appeal does not automatically justify a costs award.

A separate revised scheme is still relevant

The Inspector attached substantial weight to reuse of a prominent underused urban site, provision of specialist accommodation and the economic benefits of investment. He also recognised an improvement in local shopping choice. But those benefits did not overcome the clear policy reasons for refusing the specific scheme before him: trees, highways and uncertainty over biodiversity gains.

There is an important distinction for anyone following the site. Local reporting on 28 October 2026 described a separate revised Aldi application progressing towards a decision, with demolition preparations under way. That report indicated an expected decision date of 2 December. The dismissal of appeal 6012349 does not decide or pre-empt that later application, which must be assessed on its own plans and evidence.

The Aldi Leicester appeal is appeal 6012349, dismissed by Inspector Edward Dade on 17 November 2026. Both associated costs applications were refused. The appeal decision is also available on AppealBase. The key lesson is that regeneration benefits are not a substitute for consistent drawings and demonstrably deliverable mitigation.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news

Cambridge water objections lifted

Cambridge water objections lifted

Government says water supply objections no longer stall Greater Cambridge development, with more than 9,000 homes previously affected and wastewater challenges unresolved.