A Burnley battery appeal has secured permission for a 100-megawatt electricity storage scheme on agricultural land south of Shuttleworth House Farm in Lancashire.
Inspector L N Hughes allowed the scheme on 23 November 2026 after concluding that the site qualified as grey belt and met the remaining policy tests.
The development, proposed by Renewable Connections Ltd, would provide grid-balancing services and is permitted to operate for 40 years from its first electricity export.
Renewable Connections appealed against Burnley Borough Council’s refusal under section 78 of the Town and Country Planning Act 1990.
Why the Burnley battery appeal met the grey belt test
The site comprises agricultural land near junction 8 of the M65, bounded by road infrastructure and close to the Leeds and Liverpool Canal.
The Inspector considered the motorway, roads, canal and nearby development to be physical features containing the land, even though they were not all buildings.
For me, the important distinction is that roads and the canal could help contain development even though the appeal field itself was open.
The Inspector found no strong contribution to the three Green Belt purposes relevant to identifying grey belt land, including preventing the merger of towns.
Development of this self-contained site would also not fundamentally undermine the purposes of the remaining Green Belt across the plan area.
Our guide to grey belt and Green Belt explains why this classification is distinct from the wider assessment of a proposal.
Storage capacity targets were not a ceiling
The council and objectors argued that existing battery capacity and the pipeline of consented projects meant there was no longer an unmet national need.
They relied in part on the Clean Power Action Plan, which identifies a requirement for 23 to 27 gigawatts of battery storage by 2030.
The Inspector stated: “I see no suggestion that the flexible capacity identified in the Clean Power Action Plan 2030 should be a ceiling.”
The action plan sets policy targets, while the Inspector also considered demand beyond 2030 and the August 2026 National Planning Policy Framework.
Burnley’s Local Plan did not allocate land for battery storage, while the scheme’s proposed grid connection indicated a specific locational requirement.
The Inspector found evidenced unmet need for the type of development proposed, rather than treating the existence of other consented schemes as decisive.
Alternative sites and the planning balance
The Inspector considered arguments about alternative locations and noted the judgment in Bramley Solar Farm Residents Group [2023] EWHC 2842 (Admin).
In the circumstances of the Burnley battery appeal, the Inspector did not identify a mandatory sequential assessment of alternative locations under the relevant policies.
The proposal was also considered sustainable in transport terms because it would generate few operational vehicle movements and benefit from nearby motorway access.
The Inspector concluded that the development was not inappropriate in the Green Belt and did not require a demonstration of very special circumstances.
The decision referred to Lee Valley Regional Park Authority v Epping Forest District Council in discussing the Green Belt assessment.
Section 38(6) of the Planning and Compulsory Purchase Act 2004 required a decision in accordance with the development plan unless material considerations indicated otherwise.
The Inspector gave the conflict with Burnley’s Green Belt policy very limited weight because that policy predated the national grey belt tests.
The site’s minor adverse landscape effects would not substantially outweigh the benefits of the scheme.
The Inspector applied section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 when considering the setting of nearby listed buildings.
Distance, intervening infrastructure, topography and tree cover led the Inspector to find no harm to the significance of the listed Shuttleworth Hall.
This differs from the earlier Bexley battery appeal, which succeeded through very special circumstances after the site was found not to qualify as grey belt.
Conditions require the development to be decommissioned and the land restored after its permitted operational period.
The official appeal register lists the decision under reference 6009477.
The appeal decision is also available on AppealBase.
Quoted Planning Inspectorate decision material is reproduced under the Open Government Licence v3.0.