A caravan certificate has failed to protect a larger garden structure in Oxfordshire after an Inspector ruled that it was a building requiring planning permission.
Inspector R Merrett dismissed appeal 3377615 on 27 November 2026 at 28 Flexneys Paddock in Stanton Harcourt, upholding West Oxfordshire District Council’s enforcement notice.
The timber-framed structure measured approximately 12 metres by five metres and took two operatives around eight weeks to construct from prefabricated parts.
The notice requires removal of the outbuilding, associated raised steps and patio within six months, and a separate application for costs was also refused.
What the caravan certificate actually covered
The council had issued a lawful development certificate on 16 April 2024 for the proposed siting of a caravan for ancillary use at the property.
That proposal was around two metres shorter than the completed structure, and the application expressly stated that no building or other operations were proposed.
The Inspector concluded that the development actually undertaken was materially different because of both its larger size and the building operations that had occurred.
Our caravan lawful development certificate guidance explains why a certificate needs to describe accurately what is proposed or what already exists.
The case was assessed on the legal grounds of appeal rather than the planning merits because the appellant withdrew the ground (a) appeal seeking permission.
Why the structure failed the mobility test
The Inspector applied the building indicators of size, permanence and physical attachment, derived from Skerritts (No 2), rather than relying on any single factor.
The structure was constructed on the site from multiple component parts and supported by a system of stones, adjustable brackets and metal plates.
Its substantial weight and method of fixing, together with its prolonged occupation of the site, were relevant to the assessment of its character as a building.
The appellant argued that lifting beams and a crane could transfer the structure to a vehicle without first dismantling it.
However, the structural calculation report concerned a similar unit and the Inspector was not satisfied that it could reliably be applied to the particular structure.
The report also addressed lifting rather than transportation, and the Inspector distinguished the forces involved in those two processes.
Being able to lift a structure intact does not necessarily translate into being able to transport the structure successfully
, the Inspector explained.
There was no dispute about the statutory maximum dimensions, but the structure did not meet the mobility test required to qualify as a caravan.
Building control advice did not establish planning lawfulness
The appellant also relied upon a letter dated 13 December 2024 from the council’s building control manager treating the structure as a mobile home for building regulations purposes.
The Inspector explained that classification under separate regulations does not determine whether the structure constitutes development under the Town and Country Planning Act 1990.
This is particularly useful for purchasers of modular accommodation, who should establish the planning status of the specific structure rather than rely solely on a supplier’s description or building control correspondence.
The Inspector also refused the costs claim because the council had reasonably distinguished the actual development from the structure covered by the earlier certificate.
The Planning Inspectorate case record identifies the appeal, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.





0 Comments