A three-acre Hessay dog walking field fails on noise, accessibility and flooding despite satisfying the revised Green Belt policy test.

by | 27th November 2026 07:06 | Agriculture & EquestrianAppealsChange of UseGreen Belt

A dog field appeal has been dismissed in Hessay, near York, despite the Inspector finding that the recreational use was not inappropriate development in the Green Belt.

Inspector N Armstrong dismissed appeal 6012524 on 26 November 2026, upholding City of York Council’s refusal of retrospective permission for the facility on Low Moor Lane.

The existing business occupies a field advertised by its operator as three acres, with fencing, parking and hourly bookings for up to nine dogs.

Noise, accessibility and the absence of an adequate flood risk assessment were decisive, rather than harm to the Green Belt.

Why the dog field appeal passed the Green Belt test

The Inspector treated the predominantly open grassed field as outdoor recreation and assessed its physical characteristics under the revised National Planning Policy Framework.

Policy GB7(1)(f) requires the impact on openness to be minimised and no significant conflict with Green Belt purposes for the relevant exceptions to apply.

The modest area of hardstanding, existing hedgerows and rural post-and-wire boundary treatment limited the visual effects of the operation.

Booking restrictions, dog numbers and operating hours also helped minimise the spatial effect of the activity compared with unrestricted use.

This contrasts with the Cobham dog exercise appeal, where staff exercised dogs without public recreational access and the Inspector found inappropriate development.

Why noise evidence was insufficient

The original application proposed operating between 6am and 10pm daily, with the noise assessment referring to a slightly later 7am start.

Although most existing bookings involved between one and four dogs, the Inspector considered the intensity of use that permission could allow rather than average bookings.

The submitted noise assessment predicted levels below existing background noise at nearby sensitive properties, but the council questioned the use of hourly averages.

Short bursts of barking could be diluted by that averaging period, while the baseline monitoring did not cover the earliest proposed operating hours.

Inspector Armstrong observed a notable difference between periods of use and inactivity during the site visit, including barking and a walker calling dogs.

The Inspector was not satisfied that reducing the maximum number of dogs or restricting hours would adequately protect nearby residents.

Unlike the successful Durley dog paddock appeal, where simultaneous barking was specifically modelled, the Hessay evidence did not resolve the noise concerns.

Flood risk cannot simply be deferred

The field lies within Flood Zone 3a, and the Inspector noted that the applicant had submitted a flood map but no site-specific flood risk assessment.

The applicant argued that permeable hardstanding had been installed without changing the ground level or increasing runoff.

The Inspector explained that the development’s vulnerability classification did not remove the requirement for an appropriate assessment of flood risk.

Without sufficient evidence, the Inspector could not be confident that suitable mitigation or a sustainable drainage strategy could be secured through conditions.

Accessibility was also unacceptable in this case, despite suitable parking and no identified unacceptable highway safety impact.

The evidence did not establish a specific rural business need for the location or why the facility could not operate somewhere more accessible.

What this means for other dog fields

The dog field appeal demonstrates that satisfying the Green Belt exception does not remove the need to address residential amenity, sustainable transport and flooding.

Our secure dog field planning guide explains the wider considerations for operators converting agricultural land into commercial exercise facilities.

The Inspector concluded that the benefits of the development were substantially outweighed by its adverse effects under the national decision-making policies.

The decision notes that reducing dog numbers may not be sufficient because it would be difficult to fully control the behaviour of individual dogs.

The Planning Inspectorate appeal record relates to application 25/01601/FUL.

The appeal decision is also available on AppealBase.

Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news