A Hounslow enforcement appeal has permitted one external air-conditioning unit at St John’s Road, Isleworth, while leaving a rear garage extension subject to removal.
Planning Inspector S A Hanson issued the split decision on 27th November 2026 after considering three linked appeals against Hounslow Council’s notice.
The notice covered two operational developments at the mixed commercial and residential building: a garage extension and a flank-wall air-conditioning condenser.
The outcome matters because the Inspector applied the newer ten-year enforcement period and separated the merits of each element rather than treating them together.
Why the Hounslow enforcement appeal tested the ten-year rule
The Hounslow enforcement appeal demonstrates that one notice can produce different results for separate building operations at the same property.
The council issued its notice on 4th September 2025, alleging that the rear garage had been extended and an air-conditioning unit installed without planning permission.
It required demolition of the extension, removal of the condenser, clearance of resulting debris and compliance within three months.
The Inspector corrected the allegation to add the words “without planning permission”, finding that the clarification changed no substance and caused no injustice.
The appellants argued under ground (d) that enforcement action was already out of time, but they carried the burden of proving immunity on the balance of probabilities.
Section 115 of the Levelling-up and Regeneration Act 2023 extended the ordinary enforcement period for operational development from four years to ten years.
The transitional arrangements preserve the former four-year period where operational development was substantially complete before 25th April 2024.
The Inspector said, “I therefore find that the 10-year period applies in this case.”
Council evidence included a photograph from August 2023 showing that work on the garage extension had not begun, while reports placed the works in early 2025.
No evidence established that either the extension or the condenser had been completed before September 2015, so both ground (d) appeals failed.
Planning Geek’s guide to enforcement time limits explains the current ten-year rule and the transitional protection for some earlier operational development.
Why the two works received different outcomes
On the planning merits, the Inspector found that the extension would fill much of the space between the main building and garage, creating a cramped appearance and poor access.
Its timber framing and corrugated plastic sheeting were also considered inconsistent with the brick Victorian building and the surrounding residential character.
The condenser was treated differently because it occupied a modest part of a flank wall already containing a billboard, staircase, pipework and other servicing features.
Although visible from surrounding streets and homes, it was judged typical of commercial operational equipment and neither unduly prominent nor harmful.
The Inspector therefore granted planning permission for the condenser but refused permission for the garage extension, leaving the notice effective where it required that structure’s removal.
Under section 180, the requirements remain in the notice but cease to have effect to the extent that they conflict with the permission for the condenser.
The ground (f) challenge failed because no lesser steps were proposed, and the ground (g) challenge failed because the largely demolished extension made three months sufficient.
For anyone responding to a notice containing several works, the practical lesson is to test immunity, planning merits and possible remedial steps separately for every identified element.
Planning Geek’s guide to enforcement appeal grounds sets out the different statutory routes and the evidence each ground normally requires.
The Planning Inspectorate case record identifies appeal references APP/F5540/C/25/3373413, APP/F5540/C/25/3373414 and APP/F5540/C/25/3374324.
The appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.