Planning costs refused despite council failings

Two appeals over a Derbyshire hotel site failed, with costs refused despite unreasonable council conduct and unresolved noise and parking concerns.

by | 25th November 2026 12:31 | AppealsPlanning ApplicationPlanning Policy

Two planning costs claims have been rejected in Long Eaton, Derbyshire, despite an Inspector finding that Erewash Borough Council behaved unreasonably during the application process.

Inspector M Clowes also dismissed appeals for up to 14 dwellings and a 76-bed care home at the Novotel site on 25 November 2026.

Both appeals followed non-determination of the applications, with the developer proposing to redevelop parts of the existing hotel’s car park.

The decisions illustrate that demonstrating unreasonable behaviour alone is not sufficient to recover appeal expenses, even when a council subsequently supports a proposal.

Why planning costs were refused

Fairview Hotels (Nottingham) Limited claimed full costs in both cases, citing delays in validation and determination, alongside poor communication during the application process.

The Inspector found that many requests for information, including details of consultation responses, had gone unanswered for an extended period.

The council did not dispute that account or explain why it had failed to engage adequately with the applicant.

In the care home costs decision, the Inspector concluded, “I find that this amounts to unreasonable behaviour”.

However, neither claim for planning costs established that earlier engagement would have avoided an appeal or that the council’s unreasonable conduct directly caused unnecessary expenditure in the appeal proceedings.

The council subsequently indicated that it supported the care home scheme, but the Inspector identified substantive objections that remained unresolved.

Our guide to awards of costs in planning appeals explains the separate requirements of unreasonable conduct and resulting unnecessary or wasted expense.

Outdoor noise and living conditions

The appeal site lies near the M1 motorway, and both schemes relied on enhanced glazing and mechanical ventilation to achieve satisfactory indoor noise levels.

For the housing proposal, the noise assessment recorded external daytime levels of up to 67 decibels LAeq, substantially above the guideline values discussed by the Inspector.

The proposed mitigation included solid acoustic fencing or walls 2.4 metres high, but the assessment did not establish the resulting noise levels within the gardens.

Some gardens were already constrained by their shape or layout, meaning that further mitigation could potentially reduce their usability.

The care home plans included outdoor seating, walking routes and sensory gardens, but their anticipated acoustic environment had not been adequately assessed.

The environmental health consultation response had proceeded on the assumption that the care home would have no external amenity space.

The Inspector also had regard to the public sector equality duty, recognising that older and disabled residents should not face a lower standard of accommodation.

Parking evidence from a closed hotel

The existing 110-bedroom hotel has conference and restaurant facilities, and both redevelopment proposals would reduce its parking provision from approximately 160 spaces to 119.

However, the hotel was closed when the transport assessment was undertaken, leaving no observed evidence of demand from its normal operations.

For the care home, there was insufficient detail about staffing, shift patterns, visitor demand and how delivery vehicles would manoeuvre within shared areas.

The housing scheme also raised concerns about the actual number and dimensions of usable parking spaces, including reliance on garages.

The Inspector found these shortcomings went to the acceptability of the developments, rather than details that could safely be left to planning conditions.

Although the housing scheme would help address a shortfall in housing supply and both proposals would reuse previously developed land, neither passed the planning balance.

The key lesson for applicants pursuing non-determination appeals is to demonstrate how a council’s particular conduct caused avoidable costs, alongside presenting sufficient substantive planning evidence.

The decisions are available through the Planning Inspectorate under references 6009754 and 6009385.

The appeal decisions are also available on AppealBase, including the companion care home decision.

Quoted Planning Inspectorate material is reproduced under the Open Government Licence v3.0.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news

Car sales appeal wins on Green Belt farm

Car sales appeal wins on Green Belt farm

A luxury car business can remain at a Marlow farm after an Inspector found that its mixed use was not inappropriate Green Belt development.