Plans for 509 Manchester flats in two Red Bank towers are now subject to public representations following a planning notice dated 24th November 2026.
The Red Bank towers would rise to 18 and 43 storeys on a former commercial site near Cheetham Hill, north of Manchester city centre.
Manchester City Council has advertised two linked applications from LWP Redbank, including a separate proposal for new public space and associated drainage.
The developer has not secured permission for these proposals, and the council’s notice identifies an Environmental Statement accompanying the applications.
Red Bank towers and the wider neighbourhood
The proposals follow a public consultation launched in 2025, when the developer first outlined a mix of one, two and three-bedroom apartments.
According to Place North West, which reported the submission on 20th November, the project occupies about one acre and includes a proposed pocket park.
The same report puts the potential gross development value between £151 million and £166 million, depending on the eventual tenure of the homes.
It also reports that the applicant proposes no affordable homes on viability grounds, citing an appraisal prepared by CBRE.
That is the applicant’s reported position rather than an assessment accepted by the council, which will need to consider the evidence before making its decision.
Launching the 2025 consultation, a spokesperson for the project team told Place North West that “Red Bank is fast becoming a creative and vibrant part of Manchester”.
The council’s Red Bank regeneration page identifies the former railway sidings and surrounding land as an important opportunity to extend the city centre northwards.
Manchester’s wider Victoria North programme envisages 15,000 homes across seven neighbourhoods, with approximately 5,500 homes planned for Red Bank itself.
The council says £51.6 million from the Housing Infrastructure Fund has been secured to prepare more than 25 acres of brownfield land for reuse.
Those wider regeneration figures are not additional homes approved by these two applications, which must be determined on their own merits.
Two applications and an environmental assessment
Application PLA-2026-002004 covers the residential buildings, ground-floor commercial space, access alterations, drainage and other associated works following demolition of an existing building.
Application PLA-2026-002005 separately concerns the creation of public realm, including landscaping and drainage, at the same location.
The council’s published planning notice specifies a 30-day representation period for applications accompanied by an Environmental Statement.
Anyone wishing to comment should check the individual application documents and deadlines through the Manchester planning register.
The separation of the public space application from the main housing scheme is important when considering how the different elements might be secured and delivered.
A development of this scale also illustrates the importance of identifying the relevant supporting information for a major planning application.
Assessment of the towers’ appearance and relationship with existing buildings will be important, alongside matters such as transport, drainage, residential amenity and environmental effects.
The proposed commercial space could also contribute to activity at ground level, depending on the uses permitted and how the buildings connect with surrounding streets.
The next material milestone will be the council’s assessment of the proposals and representations, rather than the earlier publication of architectural designs.
Until a formal decision has been made, the number of homes, affordable housing position and proposed public spaces remain proposals rather than committed outcomes.

0 Comments