The Inspector has allowed a solar farm appeal for a 109.4-hectare development on high-quality agricultural land at West Fen Farm near March in Cambridgeshire.
Diane Cragg granted permission on 25 November 2026 after Fenland District Council refused the scheme, which can supply 49.5 megawatts to the grid.
The scheme includes 30 megawatts of battery storage, but the condition I would flag for farmers requires grazing throughout its 40-year operational life.
The developer’s separate costs application failed, despite the Inspector finding that one element of the council’s case was unreasonable.
Why the solar farm appeal succeeded on agricultural land
Site-specific surveys identified approximately 76% of the land as Grade 2 and the remaining 24% as Grade 3a, making the entire site best and most versatile agricultural land.
National policy prefers poorer-quality land where possible, but does not impose an absolute prohibition on development of the best agricultural land.
The parties agreed that 94% of Fenland’s agricultural land falls within the best and most versatile categories.
The developer’s site search was restricted to one kilometre around an overhead power line because connection costs beyond that distance would be prohibitive.
The Inspector accepted evidence that no suitable lower-quality agricultural, brownfield or previously developed land within that search area could accommodate the scheme.
Significantly, the Inspector explained that national Policy N2 “does not impose a test of strict unavoidability” when considering the agricultural land preference.
Our agricultural land classification guide explains the significance of the different grades when assessing development proposals.
Continuing agricultural use and environmental safeguards
The Inspector accepted that sheep grazing would continue during operation, replacing the existing arable production rather than permanently removing the land from agriculture.
The developer estimated that physical disturbance would affect around 2.4 hectares, with approximately 0.9 hectares potentially remaining as woodland after decommissioning.
Conditions require soil management, ongoing grazing and eventual restoration of the site to its former agricultural grade.
The Inspector found moderate overall harm to landscape character and appearance, even after taking account of the proposed screening and mitigation.
An appropriate assessment also considered the Ouse Washes and Nene Washes designated sites, with conditions intended to protect wintering birds using adjoining farmland.
The permission secures a biodiversity net gain of over 162% in habitat units, alongside conditions covering battery safety and drainage.
Applying national Policy S5, the Inspector concluded that the landscape harm and limited policy conflict clearly did not substantially outweigh the renewable energy and other benefits.
Why costs were refused despite unreasonable behaviour
The council’s position that use of high-quality farmland had to be unavoidable was found unreasonable because it applied the wrong policy test.
However, the developer relied on existing site-selection evidence and did not incur additional substantive assessment costs in answering that criticism at the hearing.
The Inspector therefore found no demonstrated wasted expense arising from the unreasonable behaviour, and declined to award costs.
The council’s remaining disagreements about agricultural impacts, landscape harm and the planning balance were considered legitimate matters of planning judgement.
If you seek costs after a solar farm appeal, identify the extra work and expense caused by the other party’s unreasonable conduct.
The official Inspectorate record relates to application F/YR25/0413/F, and the appeal decision is also available on AppealBase.