Revised biodiversity net gain (BNG) figures could not save the Walsall BNG appeal for seven homes at Gorse Farm near Aldridge.
Inspector J Smith dismissed the appeal on 25 November 2026 against Walsall Metropolitan Borough Council’s refusal of permission to redevelop the former farm and equestrian premises.
I would check the habitat figures before applying, because the Inspector set aside the corrections when it was unclear who had seen them.
Why the Walsall BNG appeal excluded revised evidence
That left the Inspector with calculations that treated habitat improvements inside the application boundary as gains elsewhere.
The application by Firstpost Homes Ltd sought seven detached houses following demolition of the farmhouse, stables and riding school, under reference 25/1006.
The appellant’s grounds of appeal were accompanied by 16 appendices, including new highway, flood risk and ecology documents that had not been before the council.
The Inspector explained that the appeal procedure should not be used to evolve a scheme and excluded the additional information on grounds of procedural fairness.
In the Inspector’s words, I have not therefore considered this new information in this appeal
.
Errors in the biodiversity metric
The problem was not simply an absence of a biodiversity calculation, because the council had identified specific defects in the metric submitted with the application.
Habitat enhancements recorded as off-site were actually within the application boundary and should have been entered as on-site gains.
The calculations also showed a loss of medium-distinctiveness habitat, principally individual trees, with replacement habitat of low distinctiveness.
An overall gain in biodiversity units does not necessarily satisfy the metric’s separate habitat trading rules, which govern how losses must be compensated.
The appellant acknowledged the errors and supplied revised calculations, an updated ecological appraisal and a revised biodiversity net gain feasibility study at appeal.
However, the Inspector assessed the original evidence instead and could not establish compliance with the biodiversity requirements in Schedule 7A of the Town and Country Planning Act 1990.
A suggested habitat monitoring and management condition did not resolve the errors identified in the original calculations.
Our guide to biodiversity net gain explains the distinction between the application-stage evidence and the subsequent biodiversity gain plan.
Grey belt and other reasons for refusal
The Inspector accepted that the former farm had become previously developed land following the cessation of agricultural use and its replacement by equestrian activities.
Nevertheless, the seven two-storey houses and their double garages would have a materially greater effect on Green Belt openness than the existing buildings.
The grey belt route also failed because the site lacked attractive and convenient sustainable access to nearby services, despite the substantial housing shortfall.
The Inspector considered a proposed footway towards Stonnall inadequate because of the unlit road, narrow walking route and difficult crossing of the A452.
Separately, the Inspector found that the site access itself would not create an unacceptable highway safety risk, distinguishing vehicle access from wider locational sustainability.
The proposal also lacked a satisfactory refuse strategy, particularly for residents who would need to move bins along a lengthy shared access road.
What applicants can learn
In the Walsall BNG appeal, the overall gain in habitat units hid a shortfall in the replacement for individual trees.
Where substantive revisions are needed after refusal, a fresh application may be a better route than assuming the Inspector will accept new documents.
The exclusion of the new evidence did not establish that the revised metric was wrong, only that it was not considered in this appeal.
The Planning Inspectorate record identifies appeal 6014850, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is reproduced under the Open Government Licence v3.0.