A Northumberland Inspector accepts structural strengthening and replacement cladding as conversion rather than rebuilding under a full planning application in the Green Belt.

by | 27th November 2026 14:34 | AppealsChange of UsePlanning Policy

A barn conversion appeal has secured full planning permission for one dwelling at Shaws House Farm near Stocksfield, Northumberland, despite concerns over the extent of replacement works.

Inspector K Lancaster allowed appeal 6013773 on 27 November 2026 for Plot 9, a vacant modern agricultural barn within a wider farmstead in the Green Belt.

The scheme retains substantial elements of the existing building, introduces a small porch and partially demolishes an adjoining barn to create a garden.

The council had already recently granted permission for apparently materially the same scheme, but the Inspector independently assessed whether the proposed works amounted to conversion or rebuilding.

Why the barn conversion appeal succeeded

The council had considered that the extent of replacement cladding, roofing and structural works would leave too little of the agricultural building to constitute reuse.

A structural appraisal dated May 2026 identified the retained concrete base, steel-framed structure and low-level blockwork, with strengthening needed to enable conversion.

The Inspector accepted that the building was of permanent and substantial construction and that a significant proportion of the existing steelwork would remain.

Replacing the wall cladding and roof materials would change its appearance, but the Inspector distinguished altering an existing building from erecting a replacement building.

The decision explains that “whether the proposed works amount to conversion and re-use rather than rebuilding is a matter of fact and degree”.

The small porch was also found not to represent a disproportionate addition, allowing the proposal to satisfy the relevant national Green Belt building reuse exception.

The garden also needed assessment

The new garden would occupy part of the footprint of an adjoining barn that would be demolished, while parking would be provided within the existing farmyard.

Although parked vehicles and domestic paraphernalia could affect openness, the Inspector weighed those effects against the reduction in built form.

The arrangements were found to minimise the impact on openness and, on balance, enhance openness in this part of the site without significantly conflicting with Green Belt purposes.

The Inspector gave very limited weight to the inconsistent part of the local Green Belt policy, applying the more recent national decision-making provisions in GB7.

Additional evidence rather than a different scheme

An updated noise assessment had resolved one refusal reason, while further structural and building control evidence addressed the remaining concerns.

The Inspector referred to Holborn Studios [2017] EWHC 2823 (Admin) when considering whether to accept information that had not been before the council.

The evidence supported the original proposal rather than materially amending it, and the council had been given an opportunity to respond.

The Inspector therefore found no prejudice to any party in considering that additional information during the appeal.

The recent permission for the same barn, reference 26/02711/FUL, was a material consideration, although the Inspector did not have the complete documentation for that application.

Full permission is not Class Q

This barn conversion appeal concerns full planning permission rather than the permitted development route explained in our Class Q guide.

Applicants should not assume that the acceptance of these strengthening works under full planning permission means the same operations would automatically satisfy Class Q.

The Inspector also found that the proposed conversion would preserve the setting of the neighbouring Grade II listed farmhouse and separately listed wall and gate piers.

Fifteen conditions include noise mitigation, highway access, drainage, sustainable construction and provision for broadband connectivity, with a restriction on additional window openings.

The Planning Inspectorate record concerns application 25/02620/FUL, and the appeal decision is also available on AppealBase.

Quoted Planning Inspectorate material is reproduced under the Open Government Licence v3.0.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news

-->