The owner has three months to submit an acoustic report for the installed pump and faces a deadline for switching it off if approval is outstanding.

by | 24th November 2026 18:53 | AppealsEnergyHouseholder

A Bexhill homeowner has won an appeal over heat pump noise, removing a 35-decibel limit and a requirement to carry out monitoring at the council’s request.

Inspector E Everitt allowed the appeal on 24th November 2026 after seeing the ground-mounted air source heat pump already installed beside the house in Withyham Road.

The detail I would watch is the deadline, because the homeowner now has three months to submit an acoustic report and eleven months to secure approval.

If the report remains unapproved at that point, the pump must be switched off until Rother District Council approves it.

Why Rother wanted to control heat pump noise

Rother granted permission on 16th June 2026 for a rear extension, alterations to the garage and loft, integrated solar panels and the heat pump.

The unit sits beside the house, a reasonably short distance from a neighbouring home, in a residential area the Inspector described as reasonably quiet.

The Inspector accepted that without suitable control, heat pump noise could affect the neighbour’s living conditions, so removing the condition altogether would leave a gap.

Rother’s original condition required an acoustic report before installation and specified a maximum rating level equivalent to 35 decibels over 15 minutes at a neighbouring noise-sensitive façade.

There was scope to justify a relaxation where that figure was impractical, but the owner would still have had to undertake monitoring on reasonable request after installation.

What the Inspector changed

The homeowner argued that the acoustic standards used by the Microgeneration Certification Scheme would provide adequate protection for the neighbouring property.

Those heat pump noise standards form part of the rules for units installed using Class G permitted development rights, which allow qualifying installations to go ahead without a planning application.

Here the homeowner had obtained express permission for the equipment as part of a wider building project, so the Inspector could not assume it met those standards.

The Inspector found the original condition “not reasonable or proportionate” because Rother had produced no substantive evidence that a stricter standard was needed at this site.

The same evidence mattered for monitoring, since the Inspector saw no need for further checks on demand once compliance with the industry standards had been demonstrated.

The replacement heat pump noise condition requires the report to address the professional advice note issued by the Chartered Institute of Environmental Health and the Institute of Acoustics.

Alternatively, where the local circumstances support relaxing the rating level, the report must explain fully why that is justified.

Why the specification submitted on appeal was set aside

The homeowner supplied further details about the unit on appeal, but the Inspector found that the differences changed what the council and neighbours had originally been asked to consider.

Applying the fairness principle discussed in Holborn Studios v Hackney, the Inspector assessed heat pump noise on the original submission and put the new specification aside.

For the owner, securing approval of the report is only the first step, since the unit must then be maintained to keep it within the approved terms.

The decision suspends the time limits if there is a legal challenge to the appeal decision or a decision taken under the replacement condition.

For anyone reading their own heat pump noise condition, I would check where the sound is to be assessed, what evidence is needed and when operation must stop.

Read the Inspector’s decision on appeal 6015828 for the full wording of the replacement condition, including the circumstances that suspend the deadlines.

Planning Inspectorate quotations are reproduced under the Open Government Licence v3.0.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news