An inspector has quashed Bromley Council’s enforcement notice over alleged use of an Orpington house as two flats and awarded the owner full appeal costs.
The decision on 24th November 2026 concerned a house on Crofton Lane where tenants occupied the ground floor and the first floor was vacant.
I would start with what someone moving in upstairs could actually do, and there was nowhere to prepare or cook a meal.
Inspector R Bartlett found that preparing the house for future subdivision had not brought two flats into use by the date of the notice.
What the inspector found inside the proposed two flats
Bromley issued its notice on 14th January 2025, requiring the two-flat use to cease and the interior to be restored to an approved layout.
The owner, Basant Mertia, had obtained permission for alterations and installed two lockable internal doors, enabling the ground and first floors to be accessed independently from the porch.
The Inspector accepted that the doors could facilitate subdivision but did not themselves constitute development or demonstrate that two flats were already in use.
Under section 55(3)(a) of the Town and Country Planning Act 1990, changing a single dwellinghouse into two or more separate dwellinghouses involves a material change of use.
The judgment in Gravesham Borough Council v Secretary of State and O’Brien identifies the domestic facilities that characterise a dwellinghouse.
Here the upstairs accommodation still required further work before it could function independently, and there was no evidence of advertising it as a completed flat available for sale or rent.
Why intention was not enough
Bromley relied on the Supreme Court’s decision in Welwyn Hatfield and the earlier Impey case, which recognised that a residential use can begin before physical occupation.
The Inspector distinguished those authorities because the first floor was not ready for independent occupation, rather than merely being an empty but usable dwelling.
The evidence did not establish the alleged change to two flats on the balance of probabilities, even if a different material change of use might have occurred.
Mr Mertia appealed on ground (b), which asks whether the events described in the notice actually happened.
The owner had asked for a view on a possible future scheme for two flats, but the inspector left that question for any planning application.
This distinction matters to anyone considering a change of use because a decision quashing an incorrectly framed notice does not grant permission for an alternative development.
Full costs awarded
In the separate costs decision, the Inspector said the council had behaved unreasonably by issuing a notice for a breach that had not yet occurred.
The council had not shown that officers inspected the interior during the six months before issuing the notice, despite previously confirming that no breach had occurred.
An inspection shortly afterwards found the absence of cooking facilities upstairs, but Bromley did not withdraw the notice when that evidence became available.
The Inspector cited R v Rochester-upon-Medway City Council, ex parte Hobday, the historical authority concerning enforcement in anticipation of a breach of planning control.
Inspector Bartlett concluded, “As the whole appeal could have been avoided, a full award of costs is warranted.”
Bromley and Mr Mertia can agree the amount between them, with the Senior Courts Costs Office assessing it if they cannot agree.
If a notice alleges use as two flats, I would check the dated photographs against the facilities in each unit before debating what the owner intended.
You can read the Orpington appeal decision and the separate costs order under reference APP/G5180/C/25/3360747.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.

0 Comments