Canford waste appeal allows 260,000-tonne facility

MVV wins permission for a major energy-from-waste plant near Poole after the Inspector accepts grey belt status and evidenced unmet need.

by | 24th November 2026 16:09 | AppealsEcologyEnergyGreen BeltPlanning Policy

The Canford waste appeal has secured permission for a major energy-from-waste facility capable of processing 260,000 tonnes of residual waste a year in Poole, Dorset.

Inspector Diane Lewis allowed MVV Environment Ltd’s appeal on 24 November 2026 against the refusal by Bournemouth, Christchurch and Poole Council.

At Canford Resource Park, I would distinguish the plant’s 31 megawatts of generating capacity from its potential to export five megawatts of heat.

Planning permission is subject to conditions, with the Inspector finding the main site met the grey belt exception to inappropriate development in the Green Belt.

Why the Canford waste appeal succeeded

The facility would replace partially completed infrastructure from an earlier energy project on approximately 2.3 hectares at the south-western end of the resource park.

Its main building would reach up to 50 metres in height, with a separate chimney and associated connections for electricity and potential heat customers.

The project is designed to operate for 40 years before its buildings are removed and the site restored.

At issue was whether the development met the revised national Green Belt policy, alongside the waste plan, environmental impacts, local amenity and transport considerations.

The Inspector found that the existing development and physical boundaries limited the site’s contribution to checking urban sprawl and maintaining separation between towns.

She placed little weight on earlier Green Belt studies, partly because their methodologies and dates predated the relevant changes to national planning policy.

The main site did not strongly contribute to the three relevant Green Belt purposes and its development would not fundamentally undermine the remaining Green Belt.

The Inspector also found an evidenced unmet need and accepted that the development was in a sustainable location given its particular transport and operational requirements.

Her conclusion was that the scheme “should not be regarded as harmful to the Green Belt or be required to demonstrate very special circumstances”.

The grey belt exception under policy GB7(1)(g) therefore applied without a separate determination of whether the previously developed land exception was also satisfied.

Consented waste capacity is not necessarily delivered capacity

The Canford waste appeal involved competing assessments of the future need for facilities serving Bournemouth, Christchurch, Poole and Dorset.

The Inspector identified a shortfall of 349,000 tonnes of residual waste management capacity annually by 2033 using the adopted Waste Plan as the starting point.

Two consented projects at Portland and Parley could meet that shortfall if both were built and became operational.

If you are assessing local waste needs, a permission alone tells you little about delivery, and the Inspector found no strong evidence both projects would proceed.

She concluded that the likelihood of excessive recovery capacity being delivered was low on the evidence before the inquiry.

The decision also illustrates the importance of the spatial strategy and proximity principle, explained in our guide to national planning policy for waste.

The Inspector noted that the Secretary of State’s reasoning on need in the earlier Portland decision was not among the matters raised in the High Court challenge or the subsequent Court of Appeal proceedings.

What about local opposition and environmental effects?

The residents’ campaign group Magwatch participated in the inquiry, with concerns including air quality, health, visual impact, traffic and the need for additional capacity.

Environmental information submitted with the original application was updated during the appeal following a request from the Planning Inspectorate in February 2026.

The Inspector recognised moderately harmful visual effects, but did not consider these unacceptable when weighed against the other planning considerations.

The heritage assessment took account of the statutory duty discussed in Barnwell Manor Wind Energy Ltd [2014] EWCA Civ 137, and the Inspector found no harm to heritage significance.

For protected habitats, screening took the precautionary approach required by People Over Wind, without relying on mitigation measures to avoid an appropriate assessment.

The Inspector concluded that the development would not adversely affect the integrity of the relevant Dorset heathland sites with mitigation secured.

A completed section 106 agreement and planning conditions address environmental safeguards, while the separate environmental permit regulates operation of the facility.

The Environment Agency granted that permit in June 2025, more than a year before the planning appeal was determined.

Carbon capture readiness is not carbon capture delivery

The facility has been designed to allow carbon capture equipment to be retrofitted, but arrangements to transport and store captured carbon dioxide are not yet fixed.

The Inspector found that early delivery of carbon capture was unlikely and treated greenhouse gas emissions and climate change effects as neutral in the planning balance.

She nevertheless attached substantial weight to improved energy security and significant weight to the potential export of heat locally.

Conditions limit annual waste throughput, require records and monitoring, and address waste catchment, traffic management, emissions and future carbon capture provision.

Overall, the Inspector found compliance with the development plan as a whole and concluded that the adverse effects did not substantially outweigh the benefits.

The Planning Inspectorate’s decision for appeal 6002440 sets out the Inspector’s reasons in full.

The appeal decision is also available on AppealBase.

Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.

0 Comments

Submit a Comment

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news