A farm roof enforcement appeal has failed in Cockerham, Lancashire, despite Lancaster City Council granting permission for a lower replacement structure.
Inspector Paul Freer upheld the notice at Batty Hill Farm on 26 November 2026, leaving the original 26-week compliance period in place.
The existing silage pit roof reaches 11 metres at its ridge, compared with eight metres for the scheme approved in October 2025.
The decision demonstrates how a later planning permission can override part of an enforcement notice without legalising the entire structure targeted by that notice.
Why the farm roof enforcement appeal failed
Lancaster City Council issued its enforcement notice on 19 June 2025, requiring removal of the roof over the existing silage pit and resulting debris.
The original appeal grounds included arguments that the alleged breach had not occurred or did not constitute a breach of planning control.
The Inspector found that having a pending planning application was not a sufficient basis for either of those grounds to succeed.
A previous retrospective planning application for the existing structure had already been refused, followed by the dismissal of a planning appeal under reference 3349052.
Consequently, section 174(2A) of the Town and Country Planning Act 1990 barred an appeal on ground (a) seeking planning permission for the unauthorised works.
The Inspector explained that the appellant did not get a second ‘bite at the cherry’.
The planning merits, potential costs to the business and implications for the daily operation of the farm were therefore outside his consideration under ground (a).
A later permission can override part of a notice
The council granted permission under reference 25/00286/FUL on 29 October 2025 for a roof over the silage pit and associated drainage infrastructure.
That permission specified an eaves height of seven metres, whereas the existing roof has nine-metre eaves.
Although the permitted development could incorporate existing supporting posts after shortening them, the roof itself remained materially different from the approved design.
Under section 180(1), an enforcement notice ceases to have effect insofar as it is inconsistent with a subsequent permission for development already carried out.
The Inspector concluded that the permission overrode the notice in relation to the supporting posts as reduced in height, but not the existing roof.
No variation to the notice was needed to reflect this statutory effect, and the appeal on ground (f) therefore failed.
Unlike the earlier Barnet enforcement appeal, where later consent covered the enforced extension, the Lancaster permission only partially displaced the notice.
Evidence needed for more time to comply
The appellant also challenged the 26-week compliance period under ground (g), referring to potential environmental damage arising from removing the roof on a working farm.
Although the Inspector recognised the logistical complexity and potential weather difficulties, no specific justification or proposed alternative compliance period had been submitted.
He therefore declined to extend the period, noting that the council retains powers under section 173A to relax the requirements of a notice.
The time required to install a replacement roof was also outside the removal requirements of the notice itself.
Our enforcement notice guide explains the available grounds of appeal and the importance of identifying the actual requirements being challenged.
For anyone dealing with farm roof enforcement, the practical lesson is to compare approved drawings with the works identified in the notice and provide evidence for any requested extension.
The Planning Inspectorate appeal reference is 3370615, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.