A caravan site appeal in the Cotswolds has failed after an Inspector found that an exemption certificate did not overcome protected habitat requirements.
Inspector M Savage upheld Cotswold District Council’s enforcement notice for land north of Longbarrow Farm, Chedworth, on 29 October 2026, subject to amendments.
The two linked appeals concerned four holiday caravans on land also used for agriculture, together with associated parking, fencing and surfacing.
The Inspector also refused the deemed planning application in Appeal A and rejected both appellants’ applications for costs.
Why the caravan site appeal failed under permitted development rules
The appellants relied on Part 5 Class A permitted development rights, which allow caravan sites in specified circumstances where a site licence is unnecessary.
One such circumstance is the operation of a certified site for members of an exempted organisation, with no more than five caravans stationed for habitation.
However, Article 3 of the General Permitted Development Order makes those rights subject to relevant provisions of the Habitats Regulations.
Under regulation 75, development likely to have a significant effect on a European site must not begin without the required written approval.
The Chedworth site lies approximately 12.9 kilometres from the Cotswold Beechwoods Special Area of Conservation, within its 15.4-kilometre recreation mitigation zone.
The appellants’ ecological assessment argued that four caravans would make a negligible difference to visitor numbers, particularly given the longer distance by road.
The Inspector found that tourists could visit the protected woodland by car and that cumulative effects from smaller developments could be important.
Written approval under regulation 77 had not been obtained, and the Inspector concluded that the development was likely to have a significant effect.
The exemption certificate had also been withdrawn by the appeal stage, so the Inspector found that the claimed permitted development rights did not apply.
Mixed use and corrections to the notice
The council had originally alleged a change from an agricultural field to a commercial holiday caravan site.
Evidence of continued sheep grazing and hay production showed that agricultural activities had not ceased, while visitors also used parts of the fields.
Applying the principles in Burdle, the Inspector found a mixed use rather than wholly separate planning units for the caravans and agriculture.
The Inspector distinguished the question of whether the notice was a nullity, discussed with reference to Miller-Mead, from defects that could be corrected without injustice.
The Inspector distinguished authorities on interpreting planning permissions, including DB Symmetry [2020] EWCA Civ 1331, from the question of whether an enforcement notice is a nullity.
The notice was amended to identify the mixed use and the specific unauthorised works, while excluding fencing associated with agriculture.
Retrospective permission and costs refused
The Inspector considered both permanent permission and a three-year temporary consent, but found neither acceptable given landscape, ecological and highway safety concerns.
The caravans and parking affected the tranquillity of the Cotswolds National Landscape, while the information provided did not establish adequate protection for bats and great crested newts.
The Inspector also gave substantial weight to intentional unauthorised development under national Policy DM8, noting that holiday bookings had begun before the necessary certificate was obtained.
The decision explains that the policy does not require consideration of whether “there was a planning advantage” from deliberately unauthorised development.
The costs decisions found that correcting the notice did not demonstrate unreasonable behaviour or that the inquiry could have been avoided through more diligent investigation.
The six-month compliance period remains in place, requiring the holiday caravan use to cease and the specified unauthorised works to be removed.
For operators considering a certified site, the decision shows why checking habitat constraints and obtaining any required approvals before starting the use is important.
The Planning Inspectorate records are 3378463 and 3378464, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.