An HMO extension appeal in Lancaster has succeeded after an Inspector granted retrospective planning permission despite rejecting the owner’s claim that the extension was immune from enforcement.
Inspector Paul Freer quashed Lancaster City Council’s notice on 27 November 2026 concerning a part two-storey and part single-storey extension at 46 Slaidburn Drive.
The extension serves the house in multiple occupation as a whole, with the appellant reporting accommodation for eight people.
The HMO extension appeal distinguishes evidence of substantial completion from the separate planning merits of retaining unauthorised building work.
Why the HMO extension appeal succeeded
The council issued its notice on 21 August 2025, requiring removal of the extension, cessation of HMO accommodation within it and clearance of the resulting debris.
The appellant challenged the notice on grounds (a), (c), (d), (f) and (g), covering planning merits, legality, immunity, the required steps and the compliance period.
Our enforcement appeal grounds guide explains why these arguments address different questions and may lead to different findings within the same decision.
The Inspector considered the extension’s scale, materials and relationship to the existing house rather than treating differences from neighbouring extensions as automatically harmful.
Although the street has a distinctive overall character, individual properties exhibit variations in bay windows, roof forms and other architectural details.
The extension followed the stepped height of the terrace and its external materials were consistent with the host dwelling, despite differences in its roof orientation.
The Inspector concluded that the extension did not harm local character and complied with Lancaster’s design policy DM29 and broadly with its householder design guidance.
An earlier certificate did not establish lawfulness
The council had granted a certificate of lawful proposed development in February 2016 for a single-storey rear extension shown on a specific drawing.
However, the Inspector found no evidence that the extension authorised by that certificate had been substantially completed separately before the larger scheme was constructed.
Instead, the evidence indicated that the side and rear extensions formed one building operation, for which no planning permission had been granted.
An application submitted in 2021 for the works as built had been returned as invalid and was never determined.
Occupation was not proof of substantial completion
The Inspector applied the former four-year enforcement period because the appellant claimed that the building operations were completed in August 2021.
Council photographs from May 2021 showed building work still underway, while street imagery showed the extension complete by May 2022.
The Inspector noted that “occupation does not necessarily equate to the building being a fully detailed building of a certain character”.
The appellant asserted that the works were substantially complete by 6 August 2021 but did not supply adequate contemporaneous documentary or photographic evidence.
Referring to Sage v Secretary of State [2003] UKHL 22, the Inspector explained that occupation does not necessarily demonstrate substantial completion of the whole operation.
Our planning enforcement time limits guide explains the transition to the ten-year regime in England and why the relevant completion date matters.
What must an enforcement notice plan show?
The appellant also cited Miller-Mead when arguing that the notice was unclear about which parts of the extension it targeted, and separately argued that its plan did not identify the extension.
The Inspector distinguished identifying the boundaries of the land from marking individual breaches on a plan, finding the notice sufficiently clear when read as a whole.
The notice was corrected to specify that the extension served the HMO use of the whole property before permission was granted on ground (a).
The Inspector consequently did not need to decide grounds (f) and (g), and the permission concerns the extension rather than separately certifying the underlying HMO use.
The Planning Inspectorate record identifies appeal APP/A2335/C/25/3373640, and the appeal decision is also available on AppealBase.