A listed outbuilding in Christchurch has gained retrospective planning permission and listed building consent for repairs, a new roof and brick cladding despite council objections.
Inspector M Aqbal allowed both appeals against Bournemouth, Christchurch and Poole Council on 24 November 2026, concerning a single historic structure behind Bridge Street.
I would look beyond the new brickwork here, because the outbuilding’s original footprint and its relationship with the listed shops both survived.
Why the listed outbuilding remained protected
The structure sits behind two principal listed properties, one designated at Grade II* and the other forming part of a Grade II listed building.
Although neither list description expressly identifies the outbuilding, the parties treated it as curtilage listed because of its age, position and historical relationship with the principal buildings.
Evidence placed the structure’s origins in at least the nineteenth century, with its presence helping to explain the historic pattern of ancillary development behind the commercial frontage.
Our listed buildings guide explains why protection can extend beyond the building expressly named in a list entry.
The Inspector assessed the planning and listed building appeals separately against their respective statutory duties, although both were addressed in the same decision letter.
Why the new brickwork was acceptable
The completed works retained the existing structure and included an external brick skin, repairs and replacement of a modern felt roof with traditional slate.
The council considered the new brickwork too stark and was concerned that concealing earlier materials made the building’s evolution harder to appreciate.
However, the listed outbuilding had already been extensively altered, including through the introduction of concrete wall panels and commercial kitchen extraction equipment.
The Inspector noted that the council itself accepted the visual improvement achieved by replacing the felt roof and acknowledged that the concrete panels were unsympathetic.
The Inspector also considered the new brickwork in the context of the enclosed rear garden, which contained substantial brick walls and other ancillary structures.
Paragraph 17 explains that the building’s significance “is not derived solely from its exposed external materials”.
Its historic footprint, location, form and subordinate relationship with the principal buildings remained intact, while a modest rooflight did not materially affect the overall heritage significance.
Preservation rather than a balance of public benefits
The Inspector accepted that the cladding reduced the visibility of some earlier fabric but concluded that the special interest of the building was preserved overall.
That differs from the Plompton Hall restoration appeal, where the Inspector identified limited heritage harm before weighing it against the public benefits of repair and reuse.
At Christchurch, the conclusion was that neither the listed buildings nor the conservation area suffered harm from the completed works.
A previously approved alternative scheme was given limited weight because there was insufficient evidence that it would actually be implemented if these appeals failed.
The council’s tree officer had requested further information about a nearby protected tree, but the Inspector found no substantive evidence of material harm.
Both permissions were granted without conditions because the works had already taken place and the Inspector considered additional requirements unnecessary.
If you are considering work to a historic garden building, our listed building consent guide explains when you may need separate approval.
The official records identify planning appeal 6009283 and listed building appeal 6007267, covering applications P/25/02922/HOU and P/25/02921/LB respectively.
The appeal decision is also available on AppealBase.