A padel court appeal at Apps Court Farm in Walton-on-Thames has failed because the ecological evidence did not establish that protected habitats would be safe.
Inspector C Walker dismissed the appeal against Elmbridge Borough Council on 27 November 2026, despite accepting the proposal under the Green Belt outdoor recreation exception.
The amended scheme proposed five floodlit courts, a performance zone, changing facilities, reception and shop, alongside 20 car parking and eight cycle spaces.
The decisive issue was potential disturbance to protected birds and the absence of adequate evidence to assess the effects of noise from the development.
Why the padel court appeal failed
The nearby Knight and Bessborough Reservoir SSSI forms part of the South West London Waterbodies Special Protection Area and Ramsar site.
The Inspector identified potential disturbance to overwintering gadwall and northern shoveler, with the designated habitat sites approximately 200 to 300 metres from the appeal site.
Natural England maintained its objection because the evidence did not adequately address noise disturbance or establish whether the adjoining lake was functionally linked to the protected sites.
An updated wildlife-sensitive lighting strategy was accepted because the council and interested parties had an opportunity to comment on it.
However, two further ecological and lighting submissions arrived with the appellant’s final comments, leaving the other parties without the opportunity to respond.
The Inspector excluded those documents on grounds of procedural fairness, which is an important distinction for applicants preparing technical evidence during an appeal.
The Inspector explained that the appropriate assessment process cannot be deferred through the use of planning conditions
.
Without adequate information about the impacts and necessary mitigation, the Inspector could not exclude an adverse effect on the integrity of the designated sites beyond reasonable scientific doubt.
Our guidance on reconsultation explains why the opportunity to respond to new material can matter when planning proposals change.
Green Belt grounds were not the problem
The original proposal included canopies reaching approximately 10.8 metres over three courts and a separate clubhouse, all of which were removed during the application process.
The remaining courts would have largely transparent enclosures and the floodlighting columns would stand approximately 6.05 metres high.
The Inspector considered that the modest ancillary structures, landscaping and revised design minimised the impact on openness for the purposes of national policy GB7(1)(f).
The proposal would also avoid significant conflict with the purposes of including land in the Green Belt, despite introducing permanent development onto open land.
There was consequently no need to establish very special circumstances, and the Inspector separately accepted the design in the context of the existing events venue.
This contrasts with our recent New Forest padel decision, where permission was granted for a different rural sports scheme.
Why evidence needs to arrive at the right time
The Inspector attributed substantial weight to the sporting, community and economic benefits of the development, recognising the demand for additional facilities.
Those benefits did not overcome the failure to demonstrate compliance with the Habitats Regulations and the national policy protecting internationally important sites.
The case demonstrates why resolving Green Belt concerns alone does not secure permission where a separate statutory environmental assessment remains incomplete.
The Planning Inspectorate record concerns application 2025/2286, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.