An agricultural use appeal at Duloe in Cornwall has rejected an allegation that a smallholding had changed to a mixed agricultural and leisure use.
Inspector Victoria Goldberg partially allowed the appeal against Cornwall Council on 27 November 2026, concerning approximately 0.8 hectares north of Trenant Cross Cottage.
The land contains around 200 fruit trees, livestock enclosures and growing areas, with a caravan, shipping container structure, greenhouse and timber buildings.
The Inspector removed the hobby plot and caravan-use allegations but separately considered whether the structures required planning permission and granted permission for several of them.
Why the agricultural use appeal succeeded in part
The enforcement notice issued on 4 March 2026 alleged that the land had acquired a leisure use akin to a domestic garden.
The council relied partly on the limited scale of agricultural production, the appellant’s employment elsewhere and the fact that the activities were not commercial.
The Inspector considered the Court of Appeal authority Pitman v Secretary of State for the Environment [1989] JPL 831, as cited in the appeal decision.
That authority was distinguished because the relevant question concerned the character of the use rather than whether individual agricultural activities were enjoyable or profitable.
The Inspector explained that activities undertaken in someone’s spare time did not in themselves establish that the land was used for leisure.
The statutory definition of agriculture in section 336 of the Town and Country Planning Act 1990 does not require such a connection
with trade or business.
The crop cultivation, fruit trees, livestock and hay production described in the evidence were consistent with the Inspector’s own observations of the holding.
Items associated with agricultural work and animal feed were also observed in the caravan, which was said to provide somewhere to rest while working.
The Inspector found on the balance of probabilities that the alleged change of use had not occurred, so the relevant parts of the notice were deleted.
Agricultural activity does not authorise all buildings
The notice separately alleged operational development and the successful challenge to the use allegation did not establish that the buildings were lawful.
The land measures less than one hectare and does not meet the five-hectare threshold for Part 6 Class A agricultural permitted development rights.
Our agricultural permitted development guidance explains the different rights available according to the circumstances of the holding.
The Inspector therefore found that the operational development alleged in the corrected notice constituted a breach, before assessing the planning merits under ground (a).
The agricultural function, subdued appearance and restricted visibility of the remaining buildings helped establish that they would not harm the designated local landscape.
Permission was granted for the shipping container structure, most timber structures, greenhouse and fencing, subject to a condition controlling external lighting.
The corrected notice and remaining requirements
The polytunnel and most southerly timber structure had already been removed and remained subject to the upheld notice rather than the permission granted.
The retrospective lighting condition requires submission of a scheme within three months and its implementation within two months of the council’s approval.
Where the granted permission conflicts with the corrected notice, section 180 of the 1990 Act provides for the inconsistent requirements to cease to have effect.
The Planning Inspectorate record contains the formal decision, and the appeal decision is also available on AppealBase.
Quoted Planning Inspectorate material is Crown copyright under the Open Government Licence v3.0.

0 Comments