Planning consultancyBacked by the UK's leading planning resource

Need planning help?

Applications, appeals, permitted development, enforcement and planning strategy across England

Get planning advice →

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Planning Geek on YouTube

Planning Geek on YouTube

Planning explanations, updates and practical guidance in video form

Watch on YouTube →

Need planning help in Wales?

Planning in Wales has its own legislation, policy and procedures. Planning Geek can help with permitted development, applications, appeals, enforcement and planning strategy, making sure the right Welsh rules are used from the start.

Get planning help →

 

Jurisdiction: Wales
This page explains Article 3 of the Town and Country Planning (General Permitted Development) Order 1995 as it applies in Wales. Article 3 is the provision that actually grants the planning permission behind permitted development rights.

People often talk about a Class in the GPDO as though the Class itself grants planning permission. Strictly speaking, the permission comes from Article 3. Schedule 2 describes the development which can benefit from that permission and then adds the relevant limits, exceptions and conditions.

That distinction matters because satisfying the wording of a particular Class is not always enough. Article 3 contains several rules which can prevent the Schedule 2 permission from being used at all.

You can read the latest revised Article 3 on legislation.gov.uk. England now has a separate GPDO, so this page should only be used for development in Wales.

 

Article 3(1) to (3) – the permission behind the GPDO

 

Article 3(1) grants planning permission for the classes of development described as permitted development in Schedule 2. Article 3(2) immediately qualifies that permission: every relevant exception, limitation and condition in Schedule 2 still has to be satisfied.

Article 3(3) then makes the drafting work. When a later provision refers to permission granted by Schedule 2, a Part or a Class, it is referring back to the planning permission granted by Article 3.

In practical terms, the test is therefore not simply “does my development look like Class A?” It is whether the proposal falls within the development described by that Class, complies with its limits and conditions, and is not prevented by one of the wider Article 3 restrictions.

 

Article 3(4) – an existing planning condition can block permitted development

 

Article 3(4) says that the GPDO does not permit development which would be contrary to a condition imposed on another planning permission.

This is why checking the planning history can be essential. A house, commercial building or site may appear to have a permitted development right under Schedule 2, but an earlier planning permission may contain a condition removing or restricting the ability to rely on it.

That is different from an Article 4 direction. An Article 4 direction restricts permitted development through the GPDO machinery. Article 3(4) is concerned with a condition attached to a particular planning permission. The wording and effect of the condition itself therefore need to be checked before relying on the GPDO.

 

Article 3(5) – an unlawful building or use cannot found the right

 

Article 3(5) prevents reliance on Schedule 2 where the permitted development right depends on an existing building whose construction was unlawful, or an existing use which is unlawful.

This can be easy to overlook. A proposal may satisfy every dimensional limit in the relevant Class but still fail because the building or use on which the right depends is not lawful.

The question is the lawfulness of the existing building operations or use. It is not enough simply to point to the fact that they physically exist.

 

Article 3(6) – highways and dangerous visibility

 

Subject to specific exceptions, Article 3 does not authorise development which requires the formation, laying out or material widening of an access to a trunk road or classified road. It also prevents reliance on the GPDO where the development would create an obstruction to the view of people using a vehicular highway in a way likely to cause danger.

The Article contains exceptions for development within Parts 9, 11, 13 and 30 of the Welsh Schedule 2. We will deal with those Parts individually when we reach them rather than treating Article 3(6) as a universal ban on every highway-related operation.

 

Article 3(7) to (9) – other general restrictions

 

Article 3 also contains three more specialised controls:

  • Article 3(7) deals with certain Part 11 development authorised by another Act or order where a separate consent or approval is still required
  • Article 3(8) restricts the laying or construction of a notifiable pipeline, subject to the stated gas transporter exception
  • Article 3(9) provides that Schedule 2 does not generally permit development requiring or involving demolition of a building except where Part 31 provides the permission. For this paragraph only, “building” does not include part of a building

These provisions are another reason to check Article 3 before treating a Schedule 2 Class as a complete answer in isolation.

 

Article 3(10) to (12) – Environmental Impact Assessment

 

The current Welsh wording of Article 3(10) and (11) is tied to the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017.

Broadly, Schedule 1 or Schedule 2 development within those EIA Regulations cannot rely on the GPDO unless the necessary screening process establishes that it is not EIA development, or the appropriate exemption applies. If the development is found to be EIA development, Article 3 prevents the GPDO permission being used.

Article 3(12) contains a number of specific exceptions to that rule for particular statutory and infrastructure development. Those exceptions are technical and Class-specific, so we will cross-link them when the relevant Parts are built.

This EIA restriction is separate from any prior approval procedure contained within an individual permitted development Class.

 

Habitats Regulations – an important Welsh drafting wrinkle

 

The face of the revised 1995 GPDO still says that Article 3(1) is subject to regulations 60 to 63 of the Conservation (Natural Habitats, &c.) Regulations 1994. Those Regulations have long since been replaced, so that historic cross-reference should not be read as though the 1994 Regulations are still the current code.

For the Welsh 1995 GPDO, the transition is unusually awkward. Schedule 7 to the Conservation of Habitats and Species Regulations 2017 expressly preserves regulation 73 of the 2010 Habitats Regulations so far as it relates to planning permission granted by a general development order made before 30th November 2017. The Welsh GPDO was made in 1995, so it falls within that preserved category.

Regulation 73 imposes a condition where development is likely to have a significant effect on a protected European site or European offshore marine site and is not directly connected with or necessary to its management. Such development must not simply proceed in reliance on the GPDO.

A technical warning
The 2017 Regulations preserved regulation 73 of the 2010 Regulations for older GDOs, but regulation 73 itself refers to an approval provision in the 2010 Regulations which was otherwise revoked. This has caused genuine uncertainty in the drafting. Planning Geek is therefore not going to pretend that the transition is tidier than the legislation makes it.

The practical Welsh position is nevertheless clear. Current Natural Resources Wales advice says that permitted development likely to have a significant effect on an SAC must not commence until the planning authority has given the necessary written approval. Welsh planning guidance and Planning Inspectorate material continue to treat affected GPDO development as requiring the Habitats Regulations assessment/approval route.

If a proposal could affect a protected site, do not assume that having a permitted development right is the end of the matter. The Habitats Regulations need to be dealt with before development begins.

 

Article 3(13) – electronic applications

 

Article 3(13) was added for Wales in 2005. Where an application required under one of the specified Schedule 2 Parts is made electronically, the applicant is treated as agreeing to electronic communications for matters relating to that application.

The electronic address associated with the application becomes the address for those communications. The applicant can revoke that agreement in writing, but the revocation cannot take effect less than seven days after the notice is given.

This paragraph currently refers specifically to applications under Parts 6, 7, 22, 23, 24, 30 and 31. We will check that cross-reference again whenever one of those Parts is amended.

 

Article 3 is the starting point, not the whole answer

 

The easiest way to think about the Welsh GPDO is that Article 3 opens the door to permitted development, while Schedule 2 tells you which developments can walk through it and on what terms.

You therefore need both layers. A development can fail because it does not satisfy its Class, but it can also fail because one of the wider Article 3 restrictions applies.

The next step is Article 4, which allows permitted development rights granted through Article 3 to be restricted by direction. The Welsh Article 4 procedure was substantially changed in 2022, and the Welsh page is built from that current procedure rather than copied from the English section.

 

Article 3 legislation

 

Article 3 is the provision which actually grants the planning permission. The wording below follows the current revised text applying to the 1995 Order. Provisions which have been omitted are marked as such rather than silently removed.

Permitted development

3.—(1) Subject to the provisions of this Order and regulations 60 to 63 of the Conservation (Natural Habitats, & c.) Regulations 1994 (general development orders), planning permission is hereby granted for the classes of development described as permitted development in Schedule 2.

(2) Any permission granted by paragraph (1) is subject to any relevant exception, limitation or condition specified in Schedule 2.

(3) References in the following provisions of this Order to permission granted by Schedule 2 or by any Part, Class or paragraph of that Schedule are references to the permission granted by this article in relation to development described in that Schedule or that provision of that Schedule.

(4) Nothing in this Order permits development contrary to any condition imposed by any planning permission granted or deemed to be granted under Part III of the Act otherwise than by this Order.

(5) The permission granted by Schedule 2 shall not apply if—

(a) in the case of permission granted in connection with an existing building, the building operations involved in the construction of that building are unlawful;
(b) in the case of permission granted in connection with an existing use, that use is unlawful.

(6) The permission granted by Schedule 2 shall not, except in relation to development permitted by Parts 9, 11, 13 or 30, authorise any development which requires or involves the formation, laying out or material widening of a means of access to an existing highway which is a trunk road or classified road, or creates an obstruction to the view of persons using any highway used by vehicular traffic, so as to be likely to cause danger to such persons.

(7) Any development falling within Part 11 of Schedule 2 authorised by an Act or order subject to the grant of any consent or approval shall not be treated for the purposes of this Order as authorised unless and until that consent or approval is obtained, except where the Act was passed or the order made after 1st July 1948 and it contains provision to the contrary.

(8) Schedule 2 does not grant permission for the laying or construction of a notifiable pipe-line, except in the case of the laying or construction of a notifiable pipe-line by a public gas transporter in accordance with Class F of Part 17 of that Schedule.

(9) Except as provided in Part 31, Schedule 2 does not permit any development which requires or involves the demolition of a building, but in this paragraph “building” does not include part of a building.

(10) Subject to paragraph (12), Schedule 1 development or Schedule 2 development within the meaning of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017 (“the EIA Regulations”) is not permitted by this Order unless:

(a) the local planning authority has adopted a screening opinion under regulation 5 of those Regulations that the development is not EIA development;
(b) the Secretary of State has, or the Welsh Ministers have, made a screening direction under regulation 5(11) or 7(6) of those Regulations that the development is not EIA development; or
(c) the Secretary of State has, or the Welsh Ministers have, given a direction under regulation 5(4) of those Regulations that the development is exempted from the application of those Regulations.

(11) Where:

(a) the local planning authority has adopted a screening opinion pursuant to regulation 5 of the EIA Regulations that development is EIA development and the Secretary of State has, or the Welsh Ministers have, in relation to that development neither made a screening direction to the contrary under regulation 5(11) or 7(6) of those Regulations nor directed under regulation 5(4) of those Regulations that the development is exempted from the application of those Regulations; or
(b) the Secretary of State has, or the Welsh Ministers have, directed that development is EIA development,

that development shall be treated, for the purposes of paragraph (10), as development which is not permitted by this Order.

(12) Paragraph (10) does not apply to—

(a) [omitted];
(b) development which consists of the carrying out by a drainage body within the meaning of the Land Drainage Act 1991 of improvement works within the meaning of the Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999;
(c) [omitted];
(d) development for which permission is granted by Part 7, Class D of Part 8, Part 11, Class B of Part 12, Class F(a) of Part 17, Class A or Class B of Part 20 or Class B of Part 21 of Schedule 2;
(e) development for which permission is granted by Class C or Class D of Part 20, Class A of Part 21 or Class B of Part 22 of Schedule 2 where the land in, on or under which the development is to be carried out is—

(i) in the case of Class C or Class D of Part 20, on the same authorised site,
(ii) in the case of Class A of Part 21, on the same premises or, as the case may be, the same ancillary mining land,
(iii) in the case of Class B of Part 22, on the same land or, as the case may be, on land adjoining that land,

as that in, on or under which development of any description permitted by the same Class has been carried out before 14th March 1999;
(f) the completion of any development begun before 14th March 1999;
(g) development for which permission is granted by Class B of Part 13.

(13) Where a person uses electronic communications for making any application required to be made under any of Parts 6, 7, 22, 23, 24, 30 or 31 of Schedule 2, that person shall be taken to have agreed—

(a) to the use of electronic communications for all purposes relating to his application which are capable of being effected using such communications;
(b) that his address for the purpose of such communications is the address incorporated into, or otherwise logically associated with, his application; and
(c) that his deemed agreement under this paragraph shall subsist until he gives notice in writing that he wishes to revoke the agreement (and such revocation shall be final and shall take effect on a date specified by him but not less than seven days after the date on which the notice is given).

View the current revised Article 3 on legislation.gov.uk. The current EIA wording points to the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017.

Welsh GPDO Articles

The Articles are the legal framework for the General Permitted Development Order in Wales. Use the links below to move between the current Articles or return to the Welsh GPDO section.