A demolition enforcement appeal in Kent has failed after an Inspector upheld a notice requiring the original house on a replacement-dwelling site to be demolished. Inspector Stephen Hawkins dismissed the appeal on 5 November 2026, finding that the six-month compliance period imposed by Tunbridge Wells Borough Council was reasonable.

The dispute concerns the retention of Windmill Cottage at a property on Hastings Road in Matfield, within the High Weald National Landscape. Permission for its replacement included a condition requiring the old dwelling to be removed no later than first occupation of the new house, but both buildings remained on the land.

The demolition enforcement appeal was not a fresh opportunity to seek permission to keep the cottage. The appellant challenged only the period allowed for compliance under ground (g) of section 174(2) of the Town and Country Planning Act 1990. The Inspector rejected a request to extend that period to twelve months.

Why the demolition enforcement appeal failed

The enforcement notice was issued on 9 December 2025. It alleged that the original dwelling, subsequently known as Windmill Cottage, had been retained after the replacement house was occupied, contrary to condition 9 of planning permission 20/03572/FULL. The notice required demolition of the original building and removal of the resulting materials, rubble and rubbish.

The original decision was a replacement-dwelling permission rather than consent for two permanent independent homes. The demolition condition was central to how the development had been authorised. Its alleged breach formed the basis of the enforcement notice, but the scope of this particular appeal was much narrower than whether the council’s action was otherwise justified.

The appellant sought twelve months to comply, rather than the six months specified by the authority, arguing that this would be a reasonable period for carrying out the remedial works. Inspector Hawkins considered the written submissions and determined the case without a site visit.

The demolition enforcement appeal ended in dismissal because the Inspector was not persuaded that six months imposed a disproportionate practical burden. The Inspector considered the period more than sufficient for occupants to obtain funds for other accommodation, find somewhere to live and move out, while allowing the appellant to organise demolition and clearance.

What a ground (g) enforcement appeal can decide

Under section 174(2)(g), an appellant can argue that the time allowed by an enforcement notice is shorter than should reasonably be permitted. It is not the same as a ground (a) appeal seeking planning permission or a ground (c) contention that the alleged matters do not constitute a breach of planning control.

That distinction mattered at Matfield. Inspector Hawkins stressed that, because the appeal proceeded only on ground (g), the sole matter before the Inspector was the length of the compliance period. The appellant could not reasonably expect the notice to be quashed through this particular challenge, even if a longer period had been granted.

The demolition enforcement appeal illustrates why a notice must be read carefully before deciding which statutory grounds to pursue. Some grounds raise planning merits or legal validity; ground (g) addresses timing. Planning Geek’s guide to enforcement appeal grounds explains the different tests and the evidence required.

A successful ground (g) challenge can alter when compliance must take place without making the development lawful. Conversely, losing the challenge leaves the original requirements and their compliance timetable intact, subject to the normal operation of enforcement appeal procedure. An appeal should not be mistaken for a lasting permission to retain the building.

The earlier attempt to retain the cottage

The Inspector recorded that the property has two dwellings within the countryside of the High Weald National Landscape. Permission for the replacement dwelling required the old house to be demolished by no later than first occupation of the new house. The retained structure was subsequently proposed for use as a residential annexe.

Tunbridge Wells Borough Council refused that later application, and the appeal against refusal was dismissed in June 2025 under reference APP/M2270/W/24/3358112. The 5 November 2026 decision did not reopen the merits of the annexe proposal. It took the earlier result and the replacement-dwelling condition as part of the background to the enforcement dispute.

Owners considering an additional annexe should not assume that the continued presence of an original building is acceptable simply because the replacement dwelling has been completed. Planning Geek’s granny annexe planning guide explains why the use and relationship of ancillary accommodation to the main house are important.

This aspect of the demolition enforcement appeal is particularly relevant to countryside replacement-home schemes. A condition to remove the existing house may be an essential part of the permission, and a subsequent annexe application has to succeed on its own merits. Neither occupancy nor expenditure necessarily protects a retained building from enforcement.

Why the Inspector rejected a further delay

The decision records that the appellant wanted a further six months, arguing that twelve months in total would be a reasonable period for the remedial works. Inspector Hawkins accepted the need to balance remedying the breach with avoiding a disproportionate burden on the appellant, but found scant firm evidence to justify a longer timetable.

The Inspector observed that six months allowed time to seek finance for alternative accommodation, locate it and vacate the property. It also allowed time to arrange the demolition and remove the waste. That judgment turned on whether the appellant had actually shown that those steps could not reasonably be completed within the period already provided.

Inspector Hawkins wrote that the compliance period is not too short and is reasonable. The Inspector also took into account the delay already created by bringing a ground (g) appeal despite there being no realistic prospect of the notice being quashed on the chosen ground.

The demolition enforcement appeal consequently failed on the precise question of timing, not on an assessment of the visual merits of two houses in the National Landscape. The Inspector considered that extending the period merely to prolong the breach would not support confidence in the planning system.

What an enforcement recipient should do next

The practical lesson is to put concrete evidence behind any request for additional time. Quotes or contracts for demolition, evidence of contractor availability, realistic accommodation arrangements and evidence of genuinely unavoidable obstacles can be more useful than an unsupported assertion that a longer period would be convenient.

Separately, the applicant must identify which appeal grounds are genuinely available and whether a planning application or other mechanism could lawfully resolve the underlying issue. Planning Geek’s enforcement notices guide sets out how notices operate and what matters when deciding whether and how to appeal.

The official Inspectorate reference is APP/M2270/C/26/3377417, decided on 5 November 2026. The appeal decision is also available on AppealBase. The outcome leaves the notice upheld with its original six-month compliance period, rather than authorising continued occupation of Windmill Cottage.

0 Comments

Affected by this story, or spotted something we should check? Report an issue with this article

Planning news by email

Get the latest Planning Geek stories in one daily digest.

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Media enquiries

Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?

Request a comment →

YouTube

Planning Geek on YouTube

Watch Ian explain permitted development, use classes, planning applications and current planning changes.

Watch on YouTube

Latest planning news

Liverpool HMO appeal: full costs award

Liverpool HMO appeal: full costs award

An Inspector allows two Liverpool HMOs and awards full appeal costs after finding the council’s noise objections inadequately supported.

Rural leisure appeal fails on highways

Rural leisure appeal fails on highways

Three farm barns proposed for sports and recreation fail at appeal over rural road safety and missing biodiversity information, despite acceptable Green Belt impacts.