Class L: Removing a mineral stockpile

 

Part 17 Class L permits the removal of material from a stockpile. Paragraph N gives “stockpile” a specific meaning: a mineral-working deposit consisting primarily of minerals stored for processing or sale.

A heap of unrelated waste or spoil is not necessarily a statutory stockpile. Establish the deposit’s character before relying on this short provision.

England only. For other jurisdictions, see the Welsh GPDO or local legislation.

Wheeled loader removing aggregate from a stockpile

Need help with permitted development?

Permitted development can avoid a full planning application, but only if the right applies and every relevant limit and condition is met. Planning Geek can check the planning history, Article 4 directions and other restrictions, and help with a lawful development certificate or prior approval where needed.

Get planning help →

 

The legal test

Class L contains a concise grant for removal of material of any description from a qualifying stockpile. There is no separate Class L notice or prior approval procedure in the class itself. The apparent simplicity should not lead to applying it to every heap: first establish that Paragraph N’s mineral-working stockpile definition is met, then check the GPDO’s general restrictions and any other relevant legal controls.

If the deposit is not a stockpile, Class M may be the relevant route, with its own notice, area or age test, and potential restoration scheme.

 

Relevant legislation

Read the current GPDO Schedule 2 Part 17 text together with the general limits in Article 3. The statutory extract below provides the detailed class wording; check the consolidated text for any later changes.

Class L: Removing a mineral stockpile statutory wording

Class L – removal of material from a stockpile

Permitted development

L. The removal of material of any description from a stockpile.

 

Page created: 16th August 2023
Page updated: 24th September 2026