Part 16: Communications

 

Communications infrastructure keeps homes, businesses and public services connected. Part 16 of the General Permitted Development Order gives certain operators rights to install, alter or replace equipment, including mobile phone masts used for 4G and 5G, antennas and associated apparatus.

Those rights have limits. Some work requires the council to consider its position and appearance before it starts. Other work can proceed without that application, while proposals outside the rules may need a full planning application. This section explains which route applies.

This section covers England. Wales, Scotland and Northern Ireland have their own planning rules. See our Welsh GPDO section for Wales.

Part 16 communications telecom mast with antennas and equipment cabinets

Need help with permitted development?

Permitted development can avoid a full planning application, but only if the right applies and every relevant limit and condition is met. Planning Geek can check the planning history, Article 4 directions and other restrictions, and help with a lawful development certificate or prior approval where needed.

Get planning help →

 

Which communications class do you need?

 

Part 16 contains five development classes, followed by an antenna measurement rule. A letter on its own is not enough: for example, Class A in Part 16 is different from Class A in Part 1 for houses.

Provision What it covers
Class A Electronic communications code operators: mobile masts, antennas, cabinets, network apparatus and qualifying emergency works
Class B Microwave antennas on qualifying buildings or structures 15 metres or more in height, outside Class A
Class C Microwave antennas, including satellite dishes, on qualifying buildings or structures below 15 metres, outside Class A
Class D System apparatus installed by or for a licensed driver information system operator
Class E Specified development for a universal postal service provider
Paragraph F How antenna length is measured; this is not another development right

 

New and replacement mobile phone masts

 

Most mobile network proposals fall under Class A. Its rights are for development by or on behalf of an electronic communications code operator for its network. Owning a field or buying a mast does not, by itself, qualify someone to use them.

For a new ground mast, the headline height limits are generally 30 metres on unprotected land that is not on a highway, and 25 metres on article 2(3) land or on a highway. Antennas are excluded from these particular measurements. These figures are not a complete permission: the site, apparatus, other restrictions and any required prior approval still matter. A site of special scientific interest needs separate care.

Replacement and enlarged masts have different tests. Some existing structures can be replaced at their existing height, and some upgrades can proceed without prior approval. Height, width, location and the previous permission all need checking. The Class A page gives the detailed explanation and current legislation.

 

What does prior approval mean?

 

For the work that requires it, the operator must apply before starting. The council considers whether its prior approval of siting and appearance is required and, if it is, whether the details are acceptable. This is a limited decision under an existing permitted development right, rather than a fresh decision on every possible planning issue.

Residents can make relevant representations. Useful points can include the mast’s scale in its surroundings, a sensitive view, footway obstruction or a realistic less harmful position. A large number of objections does not change the legal test. Our Class A guide explains the application and 56-day procedure.

For a practical explanation of what residents can object to, how to submit useful comments and what future 6G networks may change, read our 5G mast planning permission and objections guide.

 

5G, future 6G and fixed broadband

 

Part 16 is written around operators, apparatus and development, rather than a list of mobile generations. A 5G label does not create an exemption from the rules. Equally, the absence of the word 6G does not automatically exclude future equipment. The actual proposal must satisfy the rights in force at the time.

More network capacity can involve antennas on existing buildings, upgraded masts or small cells as well as new sites. Fixed broadband poles, lines and cabinets also have their own provisions within Class A. Do not apply a headline mobile mast rule to every type of communications equipment.

 

Checks before relying on Part 16

 

  • Identify the correct class and establish that the operator and proposed work qualify
  • Check the location, including protected land, listed buildings, sites of special scientific interest, highways and safeguarding areas
  • Measure the actual apparatus using the relevant height, width, area or volume test
  • Read all the conditions and establish whether an application or notification is required
  • Check land rights and any other necessary consent separately from planning permission

An Article 4 direction does not automatically remove the code operator rights in Class A: the direction must specifically say that it affects them. Other restrictions in the GPDO and relevant planning conditions also need checking.

There is no application simply because an operator wishes to rely on a permitted development right. Where prior approval, a lawful development certificate or full planning permission is required or sought, see our planning application fees guide. An applicant may have a planning appeal route following refusal; an objector does not have the same ordinary appeal right.

Planning Geek can help establish the right route, assess a proposal or prepare a focused planning representation. Contact us with the site address, application reference and plans.

 