Part 10: Repairs to services

 

Part 10 of Schedule 2 to the GPDO is one of the shortest parts of the Order. It contains a single permitted development right, Class A, covering repairs to services by allowing works to inspect, repair or renew a sewer, main, pipe, cable or other apparatus, including opening up land where that is needed for the work.

Back to the GPDO index

Excavated service trench showing a water main and underground cables for Part 10 repairs to services

Need help with permitted development?

Permitted development can avoid a full planning application, but only if the right applies and every relevant limit and condition is met. Planning Geek can check the planning history, Article 4 directions and other restrictions, and help with a lawful development certificate or prior approval where needed.

Get planning help →

 

Repairs to services under Part 10

 

Class A: repairs to services, pipes and cables is the whole of Part 10. It covers inspecting, repairing or renewing existing service apparatus and expressly includes breaking open land for that purpose.

The wording is broad as to the type of apparatus. Sewers, mains, pipes and cables are specifically named, followed by the wider phrase “other apparatus”. There are no Class-specific limitations, conditions or prior approval procedure attached to Class A. The general provisions of the GPDO still apply, including Article 3, and the right can be restricted by an Article 4 Direction.

 

Why Part 10 still matters

 

Section 55(2)(c) of the Town and Country Planning Act 1990 already provides that equivalent inspection, repair and renewal works carried out by a local authority or statutory undertakers are not development. Class A is not itself restricted to a particular type of developer, so it can be especially important where the person carrying out the works does not fall within that statutory exclusion.

This is an important distinction. Section 55 asks whether the works amount to development in the first place. Part 10 provides planning permission where the works are development but fall within Class A.

 

What Part 10 does not provide

 

Part 10 is a planning permission. It does not create a right to enter somebody else’s land, interfere with apparatus owned by another person or avoid separate permissions that may be required under utilities, highways, environmental or other legislation.

The wording is also about inspecting, repairing or renewing apparatus. It should not be treated as a general permitted development right to install a completely new service or to carry out unrelated engineering works.

 

Current Part 10 legislation

 

The current statutory wording can be checked directly on legislation.gov.uk:

 