Part 9: Development relating to roads

 

Part 9 of Schedule 2 to the GPDO grants a small group of permitted development rights for roads and road transport infrastructure in England. It is quite different from the better-known householder rights: most of Part 9 is tied to particular public bodies, statutory functions or transport undertakings.

Back to the GPDO index

Quiet UK dual carriageway on a summer Sunday morning illustrating Part 9 development relating to roads

Need help with permitted development?

Permitted development can avoid a full planning application, but only if the right applies and every relevant limit and condition is met. Planning Geek can check the planning history, Article 4 directions and other restrictions, and help with a lawful development certificate or prior approval where needed.

Get planning help →

 

What does Part 9 of the GPDO cover?

 

Part 9 now contains six classes. Class F for domestic cross-pavement charging channels was inserted on 21st October 2026 by SI 2026/1056. They cover highway authority works, strategic highway works under the Highways Act 1980, tramway and road transport undertakings, toll road facilities, and works to unadopted streets or private ways.

Class Main user or subject What it covers
Class A Highway authorities Road maintenance and improvement works within the road boundary, plus certain adjoining works
Class B Secretary of State or strategic highways company Works carried out in exercise of Highways Act 1980 functions, including connected or incidental works
Class C Transport undertakers Specified tramway and road transport infrastructure, including tracks, electrical equipment, shelters and some operational land development
Class D Toll road facilities Toll collection facilities and associated hardstanding, subject to specific limits
Class E Unadopted streets and private ways Works within the existing boundaries that are required for maintenance or improvement
Class F (from 21st October 2026) Highway-authorised domestic EV charging channels Channels embedded in the pavement, subject to heritage restrictions and removal conditions

 

Part 9 is not a general right to carry out road works

 

A common trap is to see the words “development relating to roads” and assume Part 9 is available to any landowner or developer. It is not. Classes A, B and C are expressly tied to highway authorities, specified strategic highway bodies or transport undertakers. Class D concerns toll road facilities, while Class E is limited to maintenance or improvement within an existing unadopted street or private way.

Permitted development is a planning permission. It does not, by itself, give a person ownership rights, a right to enter somebody else’s land, a right to interfere with the highway, or any separate consent that may be required under highways or transport legislation.

 

Why Class A refers back to section 55

 

There is an important planning-law wrinkle in Class A. Section 55(2)(b) of the Town and Country Planning Act 1990 already says that many works by a highway authority within the boundaries of a road are not “development” at all. The exception is relevant where improvement works may have significant adverse effects on the environment. Class A then provides permitted development rights for the highway authority works described in the class.

This is why it is worth asking the first question before reaching for the GPDO: is the proposed activity development in the first place?

 

Class F: cross-pavement charging channels from 21st October 2026

 

SI 2026/1056, article 7, introduces Class F from 21st October 2026. It permits the installation, alteration or replacement of a pavement-embedded cable channel from domestic premises to a parked electric vehicle, by, on behalf of, or with the authorisation of a highway authority.

Class F does not permit channels within a scheduled monument site, listed building curtilage or a conservation area. When no longer needed, the channel must be removed and the pavement reinstated as soon as reasonably practicable. Separate highway permissions remain necessary: a householder cannot cut a channel independently simply because there is a permitted development right.

The charger itself must qualify separately, for example under Part 2 Class D or Part 2 Class E, which are also amended on 21st October. The new right concerns a pavement-embedded channel, not a loose cable or surface cable cover.

Class F statutory wording from 21st October 2026

Permitted development

F. The installation, alteration or replacement of a cross-pavement solution by, on behalf of, or with the authorisation of, a highway authority.

Development not permitted

F.1. Development is not permitted by Class F if the cross-pavement solution would—

(a) be within a site designated as a scheduled monument;
(b) be within the curtilage of a listed building; or
(c) be within a conservation area.

Conditions

F.2. Development is permitted by Class F subject to the conditions that when no longer needed as a cross-pavement solution—

(a) the development is removed as soon as reasonably practicable; and
(b) the pavement within which the cross-pavement solution was set is, as soon as reasonably practicable, reinstated to its condition before that development was carried out.

Interpretation of Class F

F.3. For the purposes of Class F—

“cross-pavement solution” means a pavement-embedded cable channel that allows a cable for the recharging of electric vehicles to safely cross a footway from a domestic premises to a parked vehicle;

“footway” has the meaning given by section 329(1) of the Highways Act 1980.

 

Current Part 9 legislation

 

The current statutory wording should always be checked before relying on a permitted development right. The original 2015 Order remains the starting point, but Part 9 has been amended. In particular, Class C was clarified in 2018 so that the right is expressly development by transport undertakers.

 

Page Updated: 29th October 2026