Planning consultancyBacked by the UK's leading planning resource

Need planning help?

Applications, appeals, permitted development, enforcement and planning strategy across England

Get planning advice →

Finding Planning Geek useful?
Buy Ian a coffee to say thanks

Planning Geek on YouTube

Planning Geek on YouTube

Planning explanations, updates and practical guidance in video form

Watch on YouTube →

GPDO Article 4: directions restricting permitted development

 

Jurisdiction: England
This page contains Article 4 of the English 2015 GPDO. If you need the practical rules, maps, compensation position or current policy tests, use our main Article 4 directions guide.

Article 4 is the power which allows specified permitted development rights to be withdrawn. If a valid direction applies, the development described by the direction can no longer rely on the planning permission granted by Article 3 and normally needs a planning application instead.

An Article 4 direction does not make development unacceptable in principle. It changes the route to permission by removing the automatic permitted development right for the development covered by the direction.

 

GPDO Article 4 directions restricting permitted development in England

Need help with permitted development?

Permitted development can avoid a full planning application, but only if the right applies and every relevant limit and condition is met. Planning Geek can check the planning history, Article 4 directions and other restrictions, and help with a lawful development certificate or prior approval where needed.

Get planning help →

 

Who can make a GPDO Article 4 direction?

 

Article 4(1) allows either the Secretary of State or the relevant local planning authority to make a direction where they are satisfied that it is expedient for the specified development not to be carried out unless planning permission is granted on an application.

The direction can apply to all or some development within a particular Part, Class or paragraph in a defined area, or it can identify particular development.

There are express exclusions. Article 4 cannot be used against every permitted development right in Schedule 2.

 

Existing prior approval can be protected

 

Article 4(2) contains important exceptions. In particular, where a right is subject to prior approval and the relevant prior approval date occurs before the Article 4 direction comes into force, the direction does not affect that development if it is completed within the three-year period specified by Article 4.

The Article also preserves a number of specialist rights, including specified railway, Crown and emergency development.

 

Schedule 3 contains the procedure

 

Article 4(4) sends the procedural rules to Schedule 3. That is where the requirements for making, modifying and cancelling a direction are found.

For day-to-day use, our Article 4 overview is the better starting point. It also links to our HMO Article 4 map, Class MA Article 4 map and Article 4 compensation guide.

 

Article 4 legislation

 

Directions restricting permitted development

4.—(1) If the Secretary of State or the local planning authority is satisfied that it is expedient that development described in any Part, Class or paragraph in Schedule 2, other than Class DA of Part 4, Class CA of Part 7 or Class K, KA or M of Part 17, should not be carried out unless permission is granted for it on an application, the Secretary of State or (as the case may be) the local planning authority, may make a direction under this paragraph that the permission granted by article 3 does not apply to—
(a) all or any development of the Part, Class or paragraph in question in an area specified in the direction; or
(b) any particular development, falling within that Part, Class or paragraph, which is specified in the direction,
and the direction must specify that it is made under this paragraph.

(2) A direction under paragraph (1) does not affect the carrying out of—
(a) development permitted by any Class in Schedule 2 which is expressed to be subject to prior approval where, in relation to that development, the prior approval date occurs before the date on which the direction comes into force and the development is completed within a period of 3 years starting with the prior approval date;
(b) development permitted by Class B of Part 9 of Schedule 2;
(c) development mentioned in Class A of Part 16 of Schedule 2, unless the direction specifically so provides;
(d) development permitted by Class A of Part 18 of Schedule 2 authorised by an Act passed after 1st July 1948 or by an order requiring the approval of both Houses of Parliament approved after that date;
(e) development permitted by Class Q, R, S or T of Part 19 of Schedule 2;
(f) development permitted under Schedule 2 in an emergency.

(3) A direction made or having effect as if made under this article does not, unless the direction so provides, affect the carrying out by a statutory undertaker of the following descriptions of development—
(a) the maintenance of bridges, buildings and railway stations;
(b) the alteration and maintenance of railway track, and the provision and maintenance of track equipment, including signal boxes, signalling apparatus and other appliances and works required in connection with the movement of traffic by rail;
(c) the maintenance of docks, harbours, quays, wharves, canals and towing paths;
(d) the provision and maintenance of mechanical apparatus or appliances (including signalling equipment) required for the purposes of shipping or in connection with the embarking, disembarking, loading, discharging or transport of passengers, livestock or goods at a dock, quay, harbour, bank, wharf or basin;
(e) any development required in connection with the improvement, maintenance or repair of watercourses or drainage works;
(f) the maintenance of buildings, runways, taxiways or aprons at an aerodrome; or
(g) the provision, alteration and maintenance of equipment, apparatus and works at an aerodrome, required in connection with the movement of traffic by air (other than buildings, the construction, erection, reconstruction or alteration of which is permitted by Class F of Part 8 of Schedule 2).

(4) The procedures which must be followed in making, modifying or cancelling any direction made under article 4(1) are set out in Schedule 3.

(5) In this article and in Schedule 3—
“local planning authority” means the local planning authority whose function it would be to determine an application for planning permission for the development to which the direction relates or is proposed to relate; and
“prior approval date” means the date on which—
(a) prior approval is given;
(b) a determination that such approval is not required is given, or
(c) any period for giving such a determination has expired without the applicant being notified whether prior approval is required, given or refused.

View Article 4 on legislation.gov.uk.

 

Other GPDO Articles

 

The Articles are the framework for the General Permitted Development Order in England. Use the links below to move between the Articles or return to the main permitted development section.

 

GPDO Article 4 updated: 23rd September 2026